PAGE VEHICLE-TO-HOME (V2H) SYSTEMS
HANDBOOK
18 1920 212223 24
4.Case Studies and Pilot
Deployment V2H
Table gives extensive summary of
V2H case studies and pilot deployments
around the world.2. "UL Solutions Issues First Certification 9741 and 1741 for AI-Driven Vehicle‑to‑Grid
Compliant Charger Fermata Energy. Energy and PG&E Collaborate Pilot Vehicle-to-Home Electric Vehicle Charging Technology. March 13,
2025.
Expanded Mar 2025
via Energy with
customer rollout. n.” Zecar, September 2024. Link
Commercial V2H Products
Bus Type Bus Type
GM Energy V2H Bundle
(PowerShift Charger +
Enablement Kit Home Hub +
Inverter Dark Start battery)18
19. Link
20
Wallbox. “Nissan Approves Enhanced Fermata Energy FE‑20 Bidirectional Charger and V2X Platform for Use
with Nissan LEAF.d.” Authority, May.
23
Thai, Danny. 25
Table Case Studies and Pilot Deployment V2H
18
General Motors. 2024.” Ambibox GmbH. “GM Energy V2H Bundle: Comprehensive Home Energy Solutions.” August 28, 2024. “GM Home Charging Products Compared. 2023.
Fermata
Energy
FE Bidirectional
Charger (CHAdeMO V2X)21
UL 9741 1741-SA certified22
;
approved Nissan for LEAF use; V2X
platform for stationery and grid services
Hyundai Kai Ioniq 5/6, EV6, EV9 compatible
bidirectional chargers (Wallbox
Quasar Ambibox/Hungary,
etc.
22
UL Solutions. Link
24
Ambibox GmbH. 2023. Link
19
Rohde, Thomas.” Energy.” Link
21
Fermata Energy.
Incentives $4,500
per customer (base:
$2,500 $2,000
Validated technical
and economic
feasibility V2H.
Demonstrates
cost-
Concerns
over
battery
warranty
impacts,
consumer
hesitation
to export
power,
Objective System Configuration Limitation
.2 bidirectional
charger Energy
V2H Bundle;
software-based
energy coordination;
compatible with
2024–25 Silverado,
Equinox, Blazer,
Pilot launched Mar
2022 with lab testing
and limited trials. 2024.)23
V2L active; V2H/V2G under pilot/testing;
Ioniq spacecraft shows discharge EV
at trials; EV9 confirmed
hardware compatibility via Quasar 2
Ambibox
GmbH
Ambibox Bidirectional Wall
box24
Charger
11–22 bidirectional; solar
integration
Case Studies and Pilot Deployment V2H
Conclusion
Project Summary
PG&E–GM
V2H Pilot
(Mar 2022-
Ongoing,
expanded
Mar 2025)25
Deploy and
scale V2H
capability
for
residential
backup and
grid support
using GM
EVs
GM PowerShift
19. Link
25
GM News. 2025.2. 2024." Press release, October 11, 2023.
EVs shown to
enhance home
energy resilience
and grid flexibility. “Hyundai Ioniq Bidirectional Charging Successfully Trialled.6 discharge;
UPS-like home backup; part PG&E
pilot; total system cost $7,300-$12,70019
Wallbox Quasar Bidirectional
Charger Power Recovery
Unit)20
CCS bidirectional: 11–12 kW
charging/discharging; enables days
home backup, solar charging, dynamic
load management.2 charger; 9. “ambiCHARGE: Bidirectional Charging Technology. “Quasar V2H V2G Bidirectional Charger