3., CHAdeMO-compliant bidirectional
chargers), single-line wiring diagrams,
protection settings, and proof compliance
via JET (Japan Electrical Safety &
Environment Technology Laboratories)
certification. IEA Photovoltaic
Power Systems Programme, October 2020.PAGE VEHICLE-TO-HOME (V2H) SYSTEMS
HANDBOOK
Residential applicants are required to
submit detailed technical documentation,
such certified equipment specifications
(e. Guidance Application Documents for Grid Interconnection from Private Power Generation
Equipment.,
CHAdeMO), and protection settings
Manufacturer’s official
datasheet
Single-Line Wiring
Diagram
Illustrates system topology, including
grid interconnection point, protective
devices, and circuit layout
CAD PDF format,
signed/stamped a
licensed electrician
JET Certification
Proof
Confirms compliance with Japanese
technical standards for anti-islanding,
insulation, and grid safety
JET certificate default
factory parameter sheet
Installation
Confirmation Form
Optional but recommended some
cases; certifies installation a
qualified technician
TEPCO-approved installer
declaration stamp
.g. The
following materials are typically required for
low-voltage residential applications3
:
Table Documentation required for low-voltage residential applications
3
Tokyo Electric Power Company. National Survey Report Power Applications Japan 2019. TEPCO evaluates the system's
anti-islanding performance, voltage/
frequency protection, and the potential for
reverse power flow.g. This
regulatory framework ensures safe,
standards-compliant integration V2H
systems without compromising grid stability
or end-user safety3,4
. Link
Documentation required for low-voltage residential applications
Document Description Format
Electricity Usage
Application
Declares intent connect self-
generation device (including V2H) to
the TEPCO grid
TEPCO-standard
application form
(submitted via installer)
System
Specification
Sheet
Includes EVSE model, rated power
(kW), interface type (e.
Upon successful review, certified smart
meter capable bidirectional measurement
is installed updated, and formal
permission operate the V2H system in
grid-parallel mode granted.1 Stage Pre-Application
Documentation
The interconnection process begins with the
submission technical and administrative
documentation via TEPCO’s online
application portal through licensed
electrical contractor authorized to
coordinate distributed energy connections.
2.
The documentation must confirm the
technical integrity, certification status, and
intended operation the V2H system. Link
4
Yamazaki, Mitsuhiro, and Osamu Ikki. March 2016