Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 274 z 288

Jak získat tento dokument?






Poznámky redaktora
Lightning protection class Visual inspection (year) Comprehensive visual inspection (year) Comprehensive visual inspection in critical situations (year) I and 1 III and 1 Table 4. TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 274 Chapter Testing, maintenance and documentation . The lightning protection components for air-termination systems are tested with Iimp 100 (10/350). Components for conductors along which the lightning current can spread (at least two arrestors) and con- nections the earthing system are tested with Iimp 50 (10/350). After a conditioning phase lasting days, the components are impacted with three lightning strikes.1: Critical situations include structures containing sensitive systems, office and commercial buildings or places which large number people meet. Components for lightning protec- tion systems are tested according to IEC 62561-1. This corres- ponds test class H. This corresponds test class N. BET lightning current generator Components for lightning protection systems are tested for functionality according IEC 62561-1 – Requirements for connection components