• Checking internal lightning protection, incl. surge
arrestors and fuses.
• Checking the general condition air-termination
and conductor systems and all connection compon-
ents (no loose connections), and volume resist-
ances.
• Check the security fastening the cables the
LPS and its components.TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
Separation point metal facade
4.1 External lightning protection sys-
tem
Testing criteria
• Checking all records and documentation, including
compliance with the standards.
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
273
Chapter Testing, maintenance and documentation
. installations
at risk from explosion) must be
checked annually.
• Checking the earthing system and the earthing res-
istors incl.
Critical systems (e. transitions and connections.
• Check the documentation all modifications and
upgrades LPS and modifications buildings.g.
• Check the general level corrosion