Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 273 z 288

Jak získat tento dokument?






Poznámky redaktora
installations at risk from explosion) must be checked annually. Critical systems (e.g. transitions and connections. • Checking the general condition air-termination and conductor systems and all connection compon- ents (no loose connections), and volume resist- ances. TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 273 Chapter Testing, maintenance and documentation . • Check the security fastening the cables the LPS and its components. • Checking internal lightning protection, incl. surge arrestors and fuses. • Checking the earthing system and the earthing res- istors incl. • Check the general level corrosion.1 External lightning protection sys- tem Testing criteria • Checking all records and documentation, including compliance with the standards. • Check the documentation all modifications and upgrades LPS and modifications buildings.TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 Separation point metal facade 4