Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 210 z 288

Jak získat tento dokument?






Poznámky redaktora
Four steps comprehensive protection systems Step 1: Check the separation distance If the required separation distance cannot com- plied with, then the metallic parts must intercon- nected able carry lightning current. Step 2: Check the protection measures Measures for lightning protection equipotential bond- ing are used the and the side, e.g. mm² DC: Type 2 V20-C 3PH-1000 5094608 AC: Type 1+2 V50 3+NPE 5093526 No min. Step 4: Carrying out the equipotential bonding Local equipotential bonding must provided the inverter. lightning current arrestor (type 1). mm² DC: Type 2 V20-C 3PH-1000 5094608 AC: Type 2 V20 3+NPE 5095223 Overview protection measures TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 210 Chapter The internal lightning protection system . Initial situation External lightning protection system (according to DIN 62305) No outside lightning protection system earthing cable connection Measure Separation distance ac- cording IEC 62305 maintained Equipotential bonding Surge protection Sample product picture Adapt the lightning protec- tion system according DIN 62305 Yes min. Step 3: Include data cables Data cables must included the protection concept. mm² DC: Type 1+2 V-PV-T1+2-1000 5094230 AC: Type 1+2 V50 3+NPE 5093526 Requirements testing: LBO, Vds 2010, risk ana- lysis, … - min