The documenta-
tion should updated following each test service.
In addition visual inspection the system and its
compliance with the relevant documentation, volume
resistance must also measured. Accord-
ing the current lightning protection standard, IEC
62305, the air-termination and conduction equipment,
the earthing system and the equipotential bonding
must tested. addition, the entire system must checked
following any lightning surge voltage event.
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
270
.Every lightning protection system must undergo an
acceptance test following installation. Regular tests
must also carried out ensure correct function-
ing