The documenta-
tion should updated following each test service. Accord-
ing the current lightning protection standard, IEC
62305, the air-termination and conduction equipment,
the earthing system and the equipotential bonding
must tested. addition, the entire system must checked
following any lightning surge voltage event.Every lightning protection system must undergo an
acceptance test following installation.
In addition visual inspection the system and its
compliance with the relevant documentation, volume
resistance must also measured. Regular tests
must also carried out ensure correct function-
ing.