Testing, maintenance and docu-
mentation
Lightning protection systems must, even after the ac-
ceptance test, checked regular intervals en-
sure correct functioning, establish any faults and carry
out any necessary repairs. The test involves checking
the technical documentation, visual inspection and
measuring the lightning protection system.
The testing and servicing activities should carried
out the basis the standard and the technical
principles IEC 62305-3. This includes checking the light-
ning protection equipotential bonding and the connec-
ted lightning and surge arrestors. test report test
log used record the testing and servicing light-
ning protection systems and must updated re-
created each test/service.
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
272
Chapter Testing, maintenance and documentation
.
Testing must carried out by
specialist personnel.
The owner operator build-
ing structure responsible for
maintaining safety and ensuring
immediate rectification any
faults.
The tests also comprise checking the internal lightning
protection system