29.00.00.16
Part No.S
and one cable tiewrap MAT0170899 are required!
*Securing clips for additional attachment.5 44.igus.00.23 www.S
EL.
PMA corrugated tube
e-rib
PMA connection fitting
Securing clip, optional*
Mounting bracket connection set
Note: For each locking device clips EL.
PMA corrugated tube
e-rib
PMA connection fitting
Securing clip, optional*
Mounting bracket connection set
Note: For each locking device clips EL.01.S
and one cable tiewrap MAT0170899 are required!
*Securing clips for additional attachment.12
Bi ha
[mm] [mm] [mm] [mm] [kg/m]
EL.00.00.00.01.12
41
41
44.01.
e-rib
NW Segments
per metre
Segment
length[mm]
Weight Mounting
bracket
29 34.eu/EL.5 Bi
Ba
EL.12
I-PISG-29B
EL.0 EL.29 Product range
Reinforcement for PMA corrugated tube I-PISG-29B/S
3D CAD, configurators, service life calculation and more www.01.S
EL. They can placed anywhere the e-rib and fixed the corrugated
tube with cable tiewrap.eu/EL.Bi
Ba
176
EL.00.29
e-rib Series EL.01.12
Bi ha
[mm] [mm] [mm] [mm] [kg/m]
EL.23
I-BVND-M323GT
EL.12
Position Designation Part No.00.5 100 0.igus.01. They can placed anywhere the e-rib and fixed the corrugated
tube with cable tiewrap.
NW
23
NW
29
.00.23 e-rib for corrugated tubes from different manufacturers Nominal width EL.
Position Designation Part No.23 Product range
Reinforcement for existing corrugated tube systems
e-rib Series EL.igus.00.23.23
177
EL.0 EL.eu/e-rib
Installation dimensions and product description Installation dimensions and product description
30
35
NW
23
NW
29
At the ends, cut off the thicker section from
the e-rib and, necessary, cut size!
At the ends, cut off the thicker section from
the e-rib and, necessary, cut size!
e-rib segments can joined
together necessary with pliers
e-rib segments can joined
together necessary with pliers
Part No.01.29
I-BVND-P299GT
EL.29
I-PISG-23B
EL.
e-rib
NW Segments
per metre
Segment
length[mm]
Weight Mounting
bracket
23 147 0.00.01.29 e-rib only for PMA corrugated tube I-PISG-29B/S Nominal width 29
More information www.01