Please observe the appropriate local and statutory re-
quirements.
"People, animals and property
must protected against dam-
age from surge voltages, the con-
sequences atmospheric im-
pacts switching surges.
The specialist company installing electrical system
is required law hand over perfect condition.5.7 Responsibility the operator
For the plant operator, there the obligation make
a contribution maintenance through regular recur-
ring checks. Depending the system type, the follow-
ing standards must complied with:
• Low-voltage electrical installations
• IEC 60364-4-41
• IEC 60364-4-44
• IEC 60364-4-534
• Tests (commissioning test) and documentation
• IEC 60364-6
• 50110-1
• Requirements for solar power supply systems
• IEC 60634-7-712
• IEC 62446
1.TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
1.6 Responsibility the erection engineer
"The commissioner has the overall responsibility for
the electrical safety.5.
According the low-voltage connection ordinance
(connection ordinance Germany), the electrician lis-
ted the energy supplier’s installer list may only con-
nect tested and correct systems the public power
grid."
IEC 60364-1
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
41
Chapter General introduction
." The erection lightning pro-
tection system often requires major intervention the
electrical infrastructure building. This reflected
in the wide range standards and regulations be
complied with. The erection engineer the system is
liable for correct fulfilment for years, and the re-
quirements the insurance company come top of
that. The checking and maintenance the
electrical system components may only carried out
by electrical technician