6 Responsibility the erection engineer "The commissioner has the overall responsibility for the electrical safety. This reflected in the wide range standards and regulations be complied with.5.7 Responsibility the operator For the plant operator, there the obligation make a contribution maintenance through regular recur- ring checks." IEC 60364-1 TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 41 Chapter General introduction .5. The erection engineer the system is liable for correct fulfilment for years, and the re- quirements the insurance company come top of that. The specialist company installing electrical system is required law hand over perfect condition.TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 1. According the low-voltage connection ordinance (connection ordinance Germany), the electrician lis- ted the energy supplier’s installer list may only con- nect tested and correct systems the public power grid. Depending the system type, the follow- ing standards must complied with: • Low-voltage electrical installations • IEC 60364-4-41 • IEC 60364-4-44 • IEC 60364-4-534 • Tests (commissioning test) and documentation • IEC 60364-6 • 50110-1 • Requirements for solar power supply systems • IEC 60634-7-712 • IEC 62446 1. "People, animals and property must protected against dam- age from surge voltages, the con- sequences atmospheric im- pacts switching surges." The erection lightning pro- tection system often requires major intervention the electrical infrastructure building. The checking and maintenance the electrical system components may only carried out by electrical technician. Please observe the appropriate local and statutory re- quirements