5. The checking and maintenance the
electrical system components may only carried out
by electrical technician.TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
1.
The specialist company installing electrical system
is required law hand over perfect condition.7 Responsibility the operator
For the plant operator, there the obligation make
a contribution maintenance through regular recur-
ring checks." The erection lightning pro-
tection system often requires major intervention the
electrical infrastructure building.
According the low-voltage connection ordinance
(connection ordinance Germany), the electrician lis-
ted the energy supplier’s installer list may only con-
nect tested and correct systems the public power
grid.5. This reflected
in the wide range standards and regulations be
complied with. Depending the system type, the follow-
ing standards must complied with:
• Low-voltage electrical installations
• IEC 60364-4-41
• IEC 60364-4-44
• IEC 60364-4-534
• Tests (commissioning test) and documentation
• IEC 60364-6
• 50110-1
• Requirements for solar power supply systems
• IEC 60634-7-712
• IEC 62446
1.
Please observe the appropriate local and statutory re-
quirements."
IEC 60364-1
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
41
Chapter General introduction
. The erection engineer the system is
liable for correct fulfilment for years, and the re-
quirements the insurance company come top of
that.6 Responsibility the erection engineer
"The commissioner has the overall responsibility for
the electrical safety.
"People, animals and property
must protected against dam-
age from surge voltages, the con-
sequences atmospheric im-
pacts switching surges