Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 41 z 288

Jak získat tento dokument?






Poznámky redaktora
Please observe the appropriate local and statutory re- quirements.7 Responsibility the operator For the plant operator, there the obligation make a contribution maintenance through regular recur- ring checks. The erection engineer the system is liable for correct fulfilment for years, and the re- quirements the insurance company come top of that. Depending the system type, the follow- ing standards must complied with: • Low-voltage electrical installations • IEC 60364-4-41 • IEC 60364-4-44 • IEC 60364-4-534 • Tests (commissioning test) and documentation • IEC 60364-6 • 50110-1 • Requirements for solar power supply systems • IEC 60634-7-712 • IEC 62446 1. "People, animals and property must protected against dam- age from surge voltages, the con- sequences atmospheric im- pacts switching surges.6 Responsibility the erection engineer "The commissioner has the overall responsibility for the electrical safety." The erection lightning pro- tection system often requires major intervention the electrical infrastructure building.5.TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 1. The checking and maintenance the electrical system components may only carried out by electrical technician. The specialist company installing electrical system is required law hand over perfect condition." IEC 60364-1 TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 41 Chapter General introduction . According the low-voltage connection ordinance (connection ordinance Germany), the electrician lis- ted the energy supplier’s installer list may only con- nect tested and correct systems the public power grid.5. This reflected in the wide range standards and regulations be complied with