Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 162 z 288

Jak získat tento dokument?






Poznámky redaktora
all surrounding walls, strip foundations and the bottom the foundation, the function the foundation earther longer fulfilled. TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 162 Chapter The external lightning protection system . If the exterior walls and the foundation plate are sur- rounded with perimeter insulation, the earther the floor plate still has some earthing effect the strip foundation open the bottom. To ensure contact with the earth, water-impermeable concrete must not used.e. If the building structure surrounded all sides by perimeter insulation, i. If the perimeter insulation only the surrounding walls, earther contact often still intact. Because the foundation earther longer has contact with the earth here, additional grid ring earther must created.4.4 Perimeter insulation Perimeter insulation heat insulation, which sur- rounds the area the structure contact with the earth from outside. Connection lugs must routed into the building such way that they are resistant pressurised water above the maximum groundwater level. The founda- tion earther can implemented the concrete.4. functional equipotential bonding cable must created the foundation. often consists polyurethane foam sheets crushed glass.Insulated floor plate (perimeter insulation, shown here blue) 2