50 m Maximum groundwater level Ring earth electrode Blinding layer Spacer Min.4. Connection lugs must routed into the building such way that they are resistant to pressurised water above the maximum groundwa- ter level.TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 2. Concrete of grades such C20/25 C25/30 considered wa- ter-impermeable concrete. 1.2 Black trough The black trough bitumen plastic seal sur- rounding the structure all sides the area which it contact with the earth.50 m Maximum groundwater level Ring earth electrode Blinding layer Spacer Min.4.4. Because the foundation earther longer has contact with the earth here, an additional grid ring earther must created.3 White trough The white trough construction consisting water- impermeable concrete, i. 2. concrete cladding used corrosion protection Black trough Connection lug, min. water cannot penetrate right through the concrete. func- tional equipotential bonding cable must created in the foundation.e. 1. Because the foundation earther longer has contact with the earth here, an additional ring earther must created. Connection lug, min. concrete cladding used corrosion protection White trough TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 161 Chapter The external lightning protection system .4