1. 1. Connection lugs must routed into
the building such way that they are resistant to
pressurised water above the maximum groundwa-
ter level.4. concrete cladding used corrosion
protection
Black trough
Connection lug, min.4.TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
2.
2.4.2 Black trough
The black trough bitumen plastic seal sur-
rounding the structure all sides the area which
it contact with the earth. water cannot penetrate
right through the concrete. Concrete of
grades such C20/25 C25/30 considered wa-
ter-impermeable concrete.e. concrete cladding used corrosion
protection
White trough
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
161
Chapter The external lightning protection system
.50 m
Maximum groundwater level
Ring earth electrode
Blinding layer
Spacer
Min.4. Because the foundation
earther longer has contact with the earth here, an
additional grid ring earther must created. func-
tional equipotential bonding cable must created in
the foundation.3 White trough
The white trough construction consisting water-
impermeable concrete, i.
Connection lug, min. Because the foundation
earther longer has contact with the earth here, an
additional ring earther must created.50 m
Maximum groundwater level
Ring earth electrode
Blinding layer
Spacer
Min