Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 144 z 288

Jak získat tento dokument?






Poznámky redaktora
An approved test office will only certify the function the components manufacturer after comprehensive test, and will assign them into categories according to failure safety. For the planning lightning protection measures, these drawings must reviewed before the planning and erection the lightning protection system. Zone assignment devices according their category and/or protection level according DIN EN 60079-14 (IEC 60079-14) Zone Device category Device protection level EPL 0 Ga 1 Gb 2 Gc Zone assignment example “gasses” ATEX guidelines The ATEX directives regulate the requirements res- ulting from the use devices and protection systems in potentially explosive areas. TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 144 Chapter The external lightning protection system . addition, the testing offices use regu- lar audits with the manufacturers ensure continu- ously guaranteed product quality. In the European Union, the preconditions for complete standardisation were created the directives 2014/34/EU for manufacturers and 99/92/EC for op- erators. Due increasing inter- national economic intermeshing, major progress has been achieved the standardisation the explosion protection regulations. The quality requirements for the production resources without effective sources ignition very high.The operator building specifies the appropriate potentially explosive areas, divides them into zones and labels them diagram the systems be protected according the Ordinance Industrial Safety and Health, and the Hazardous Substances Ordinance. The manufacturers' directive 2014/34/EU (ATEX) regulates the requirements for the structure of explosion-protected devices and protection systems, by prescribing basic health and safety requirements. Manufacturers components for potentially explosive areas must obtain approval for their products. 0 Zone 0 1 Zone 1 2 Zone 2 3 Combustible substance Example assignment into zones Electrical devices may used different zones, de- pending the device protection level EPL and device category. According GefStoffV 2015, the operator is required compile this explosion protection docu- ment