Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 107 z 288

Jak získat tento dokument?






Poznámky redaktora
There need for additional anchor. The fire pro- tection bolt ties are screwed directly into the drill hole. spread- ing forces develop and mounting near masonry edges not required. The bolt tie equally suitable for cracked concrete ceilings. Construction requirements Additional requirement No smoke Additional requirement No falling dripping of burning material European classes accord- ing DIN 13501-1 Class according to DIN 4102-1 Non-combustible A1 A1 A2 - Minimum d0 A1 A2 Hardly flammable B1 Hardly flammable X A2 d0 A2, d0 B1 Hardly flammable X A2 d1 A2, d2 B1 - Minimum A2, B1 Normally flammable X D d0 - d0 - d0 E B2 - Minimum B2 Easily flammable B3 Table: Construction material classes according 13501-1 TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 107 Chapter The external lightning protection system . Taking the occurring loads for the maintenance electrical functionality applications and for false ceiling mounting into ac- count, the determined load capacities for the different masonry types are absolutely sufficient.TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 Bolt ties OBO Bettermann's fire protection bolt ties were fire- tested according ETAG 001 Part The maximum load capacity, depending fire resistance periods of up 120 minutes, was determined for different types of solid masonry. These values are documented in the appropriate test certificates