Construction requirements
Additional
requirement
No smoke
Additional requirement
No falling dripping of
burning material
European classes accord-
ing DIN 13501-1
Class according
to DIN 4102-1
Non-combustible A1
A1
A2
- Minimum d0
A1
A2
Hardly flammable B1
Hardly flammable X
A2 d0
A2, d0
B1
Hardly flammable X
A2 d1
A2, d2
B1
- Minimum A2, B1
Normally flammable X
D d0
- d0
- d0
E
B2
- Minimum B2
Easily flammable B3
Table: Construction material classes according 13501-1
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
107
Chapter The external lightning protection system
. The fire pro-
tection bolt ties are screwed directly into the drill hole.
There need for additional anchor. The bolt tie equally suitable
for cracked concrete ceilings.TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
Bolt ties
OBO Bettermann's fire protection bolt ties were fire-
tested according ETAG 001 Part The maximum
load capacity, depending fire resistance periods of
up 120 minutes, was determined for different types
of solid masonry. spread-
ing forces develop and mounting near masonry
edges not required. Taking the occurring
loads for the maintenance electrical functionality
applications and for false ceiling mounting into ac-
count, the determined load capacities for the different
masonry types are absolutely sufficient. These values are documented in
the appropriate test certificates