Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 106 z 288

Jak získat tento dokument?






Poznámky redaktora
Depending the fire resistance length (up to 120 minutes), maximum load capacity was determ- ined when anchored concrete.Metal spreading anchor OBO Bettermann's metal spreading anchors for mounting concrete were tested for fire protection.The components are tested and approved for fire resistance period minutes. Appropriate proofs are available for the tests carried out. Injection mortar The VMS Plus injection mortar system particularly suitable for fastening hollow brick, concrete and porous concrete, calcareous limestone, sand-lime brick and masonry. The connection free from spreading pressure and created through the form fitting the injection mortar with the substrate and an anchor rod. The maxim- um load capacity depending the fire resistance period and the fastening substrate documented ac- cordingly the available fire protection certificate. Al- though the load capacity the injection mortar sys- tem below the load capacity when cold, this load capacity completely sufficient for fireproof fastening of the different routing types. Special metal spreading anchors are offered for false ceilings. TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 106 Chapter The external lightning protection system . This load data is contained the appropriate European technical ap- provals and appropriate test documentation. Although the load capacity the anchors during fire below the load capacity when cold, this load capacity is completely sufficient for fireproof fastening the dif- ferent routing types