. This was particularly problematic because the washing
plant operated autonomously and failure energy chain
system could bring the entire washing process halt..M
● EC.eu/smartplastics
smartplastics|i. . Sensors monitor
the status every igus® energy chain during operation with
regard the application force but also with regard wear
and tear, and inform good time soon repair or
replacement required.M sensor measures all dynamic parameters the
energy supply
I would happy to
answer your questions.eu/predictive-maintenance CAD, configurators, service life calculation and more www..Sense online
system ensure optimum production. For this purpose, a
system was required that allows the operator monitor each
individual energy chain and avoid breakdown the plant.Ceeinanautonomoustrainwashingsystem
i.
Challenge
The previous energy chain systems competitor caused
disruptions the operation the plant, they were often
failing. use train washing
station Luxembourg .igus.
..W Sensor measures the e-chain® wear
● EC.igus.W/EC..Cee .
"If the containers stop .Cee Predictive Maintenance
EC.
Richard Habering
. Failure would
mean the confinement rail vehicle the wash hall, which
could result the cancellation several train runs...eu/smartplastics
The solution with smart plastics
The aim was find product that not only safely supplies the
washing trolleys with data, voltage, compressed air, water and
cleaning agents, but also fulfils CFL's requirement operate
Europe's most modern train washing plant.Cee
i.Cee
More information www.P/EC.igus.
Besides igus® energy chain designed for long travels, igus®
smart plastics components were installed. and many other exciting projects
i.. Here, using "machine
learning" and algorithms, calculation the service life
is performed and displayed Web dashboard any
Internet-enabled device statement "days until the next
recommended maintenance".P sensor measures the tensile forces acting the
e-chain®
● EC. the course the modernisation
of the energy chain systems, the entire cleaning system was
also renewed, that addition particularly environmentally
friendly cleaning agents, the used washing water was also
reused again and again through reprocessing.."
A big German crane manufacturer relies the i.
Read more about this application at
www. The
necessary repair measures were therefore time-consuming
and partly necessary night and weekends.1204 1205
i.