01. The test carried out the open air
with all environmental influences well simulation wind
andvibration.D
360
Bi d
ø [mm] [mm] [mm] [mm] [kg/m]
ELP.
4-chamber design
interior separation
Standard fastening: hook-type
mounting bracket without flange
Special solution: hook-type mounting
bracket with flange, optional
Installation dimensions Overview
.
igus® offers the e-loop® fully harnessed readychain® solution with cables and connectors.eu/e-loop
More information www.430.D Crossbars every link, dynamic for all moving applications
Part No.eu/e-loop
All information this page for guidance only .eu/e-loop
ELP. 430.430.
All influences due weather not affect the functionality of
the e-loop®.
e-loop® assembly instructions find out how assemble the e-loop® with
and without cables www.igus.igus.
Please contact www.Result:Thetesthasrun150,000doublestrokes.01.
Break test the e-loop®
Test setup: the e-loop® dropped from height metres
onto safe and hits with full force.
Systems this type should always designed conjunction with our engineering team.eu/contact
The e-chain® length can freely chosen.igus.1167
e-loop®
1166
ELP.430 Product range
For maximum permissible mass tonnes1)
e-loop® ELP Load and break test
igus® performs application-specific tests the in-house laboratory
Load test e-loop®
Continuous test completely harnessed e-loop® with cable
filling for 500t top drive.igus.0
This type system should designed conjunction with our engineering team.01. Everything from one source including
system guarantee
Both videos online
www.D
Bi 360
Ba 430
1
2
6
86
85
≤108
mm
e-loop® Series ELP.430
ELP. Side impacts, bumps vibration not bother
the e-loop®.
e-loop®
Weight
360 430 XXX 108 30.. Result: The test proves
that the e-loop® withstands the impact without problems; its
design resistant shocks and shatterproof.igus..eu/e-loop
3D CAD, configurators, service life calculators and more www