IGUS (en)

| Kategorie: Katalog  |

Vydal: HENNLICH s.r.o.

Strana 446 z 723

Jak získat tento dokument?






Poznámky redaktora
12 – 275 295 2. 050.0 R6.40. Fill weight [kg/m] E6 E6.40.igus.40.0 R6.5 2. 200.eu/E6_assembly Steel support tray for support the lower run ● Simple one-piece support trays for the lower run ● your requirements and specification ● options available More information From page 1356 Aluminium support tray ● Corrosion-resistant and seawater-resistant aluminium rails with adjustable width ● Noise-reducing glide strip integrated standard ● Easy installation and connection the e-chain® ● Open design dirt and debris fall through More information From page 1362 .62.40 Product range Extremely low noise and vibration More information www. 070.40 1392 1316 D S/2 S H H H F = H R 54 25 29 65 65 - 54 + 40 27.40 Crossbars removable along the inner and outer radius e-tubes Series R6.40. 150.0* E6.40.888 E6. 070.40.40 889 E6.0 0 2.0 e-chain® R6.0* E6. 075. R. 075.igus. R. 300.32 – *Width available upon request.62.40 R6. R. E6.40 . R.83 – 200 220 1. 175.40. 150. R. 225.40. R. e-tubes 40 1.0* E6.40.0 5. R6.igus.0 4.0 R6.73 – 175 195 1. with required radius (R).93 – 225 245 2. R. 125..8 Ba Bi E61.40.38 1.40.40 R6.40. 275. R.0 R6.40.40·R6.02 – 250 270 2..40. R. 250.0* E6.40.40. 087. R.41 – 75 1. R.40 Installation dimensions Unsupported applications Short travels Moving end Fixed end 3D CAD, configurators, service life calculation and more www.40.0 20 30 40 50 85 60 65 75 10 0 1.34 – 62 1.0 6.0 R6. 040.40.40.40.0kg/m fill weight) Inner height [mm] 40 Pitch [mm/link] 27. R.33 – 52 1.eu/E6 Unsupported length FLG FLB [m] Travel [m] ≤36 mm 40 54 224 248 298 348 398 498 134 146 171 196 221 271 255 295 370 450 530 685 The required clearance height: 40mm (with 2.0* E6. 052.40 e-chains® Series E6.0* E6.8 Links/m corresponds [mm] 36 1,001 e-chain® length Part No. R. R.59 70 1.100.40.53 – Part No.0 2. 300. R. R. R.0 R6.40 [mm] [mm] [kg/m] [kg/m] E6.0 e-tube Installation note system E6 To open, insert the screwdriver into the locking mechanism and prise open.40.40 R6. 275.0 R6.40 40 40 FLG FLB 0 0.0 3.40.0 R6. 100.40·R6.0* R [mm] 063 075 100 125 150 200 | E6 Series E6. 040.40.40. e-tubes 125 145 1. 062. R.40 www.. R. R.40 R6.40.0 R6. 225.0* E6. R. 100. 052.40. 250. An assembly video available online www.63 – 150 170 1. R.48 – 100 120 1.0 R6.0 R6.40.40 . Example: E6. Delivery time upon request. R.0 12 R 063 075 100 125 150 200 H D K LK = S/2 K Bi E6. R.0 E6.0 8. 087.0 8.100.0 R6. e-chains® Part No. R.40 [mm] [mm] [kg/m] [kg/m] E6.eu/R6.40.0* Bi E6.0 R6. 175.0* E6.40. 050.0 R6.43 – 87 107 1. R.0* E6.5 1.0* E6. 200.0 6.eu/E6.0* E6. R.40. R. R. 125.40.0 4.22 – 300 320 2. R. R.40 Lids removable along the inner and outer radius If gliding application required for a long travel, please consult igus®. Available bend radii Complete Part No. Repeat the procedure the other side.0* E6. R.0 R6.0 1.0 R6..igus.0* E6.0 4.40.40.29 – 50 1. 062. e-chains® Part No