If, for architectural reasons, the down-conductors can-
not routed the surface, then they should in-
stalled gaps the masonry, for example.
Here, only the fastener tested.
Fasteners
Fasteners for conductors must tested according to
IEC 62561-4.22.
The following should noted this regard:
• Plaster can damaged heat expansion. The artificial aging metallic fasteners
is tested the artificial weathering plastic hold-
ers, and mechanical load tests are also carried out.) with dimensions
larger than the quadruple down-conductor distance
should equipped with additional internal down-con-
ductors with spacing far possible.Building with glass facade
Down-conductors: special considerations
If not possible arrange down-conductors on
one side side part the building, then these
down-conductors should installed the other
sides.
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
98
Chapter The external lightning protection system
.
• Plaster may discoloured chemical reactions. equal importance
is the correct mounting the appropriate holder, with
the matching mounting material for different wall and
ceiling materials.
All the internal supports and all internal partition walls
with conductive parts, such steel reinforcement
rods, which not fulfil the conditions for the separa-
tion distance, should connected the air-termina-
tion system and the earthing system suitable points.
General information: non-isolated downconductors/
connection internal supports
Building structures with large area (such typical
industrial plants, trade fair halls, etc.
• Conductors with PVC jacketing avoid such stains. The distances between these down-conductors
should not smaller than 1/3 the distances in
Table 2