Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 98 z 288

Jak získat tento dokument?






Poznámky redaktora
The following should noted this regard: • Plaster can damaged heat expansion. The distances between these down-conductors should not smaller than 1/3 the distances in Table 2. • Conductors with PVC jacketing avoid such stains. Fasteners Fasteners for conductors must tested according to IEC 62561-4.) with dimensions larger than the quadruple down-conductor distance should equipped with additional internal down-con- ductors with spacing far possible. If, for architectural reasons, the down-conductors can- not routed the surface, then they should in- stalled gaps the masonry, for example. The artificial aging metallic fasteners is tested the artificial weathering plastic hold- ers, and mechanical load tests are also carried out. General information: non-isolated downconductors/ connection internal supports Building structures with large area (such typical industrial plants, trade fair halls, etc.Building with glass facade Down-conductors: special considerations If not possible arrange down-conductors on one side side part the building, then these down-conductors should installed the other sides. equal importance is the correct mounting the appropriate holder, with the matching mounting material for different wall and ceiling materials. TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 98 Chapter The external lightning protection system .22. Here, only the fastener tested. All the internal supports and all internal partition walls with conductive parts, such steel reinforcement rods, which not fulfil the conditions for the separa- tion distance, should connected the air-termina- tion system and the earthing system suitable points. • Plaster may discoloured chemical reactions