Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 98 z 288

Jak získat tento dokument?






Poznámky redaktora
TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 98 Chapter The external lightning protection system . equal importance is the correct mounting the appropriate holder, with the matching mounting material for different wall and ceiling materials. General information: non-isolated downconductors/ connection internal supports Building structures with large area (such typical industrial plants, trade fair halls, etc. • Plaster may discoloured chemical reactions. All the internal supports and all internal partition walls with conductive parts, such steel reinforcement rods, which not fulfil the conditions for the separa- tion distance, should connected the air-termina- tion system and the earthing system suitable points. The following should noted this regard: • Plaster can damaged heat expansion. If, for architectural reasons, the down-conductors can- not routed the surface, then they should in- stalled gaps the masonry, for example. Here, only the fastener tested.Building with glass facade Down-conductors: special considerations If not possible arrange down-conductors on one side side part the building, then these down-conductors should installed the other sides. The artificial aging metallic fasteners is tested the artificial weathering plastic hold- ers, and mechanical load tests are also carried out.22. Fasteners Fasteners for conductors must tested according to IEC 62561-4. The distances between these down-conductors should not smaller than 1/3 the distances in Table 2. • Conductors with PVC jacketing avoid such stains.) with dimensions larger than the quadruple down-conductor distance should equipped with additional internal down-con- ductors with spacing far possible