Lightning protection guide by OBO

| Kategorie: Katalog  |

Last revision 2020

Vydal: OBO BETTERMANN s. r. o. Autor: OBO BETTERMANN

Strana 96 z 288

Jak získat tento dokument?






Poznámky redaktora
Table 2. TBS Blitzschutz-Leitfaden 2018 / en / 2020/01/10 14:42:40 14:42:40 (LLExport_02613) / 2020/01/10 14:42:54 14:42:54 96 Chapter The external lightning protection system . The number conductors derived from the scope of the building protected, although least two conductors are required every case.2 Down-conductors Down-conductors are the part the external lightning protection system designed route the lightning cur- rent from the air-termination system the earthing system.Down-conductor system according IEC 62305-3 2. The conductor system routes the lightning current from air-termination system earthing system.22 shows the distances between the conductors and the corresponding lightning protection classes. order reduce the probability damage from the lightning current flowing through the lightning protection system, the down-conductors should at- tached such way that, between the impact point and the earth: • Multiple parallel current routes exist • The length the down-conductors kept short as possible • Equipotential bonding created between the con- ductive parts the building structure. Care must taken ensure that the current paths are short and installed without loops