Avoiding shade from the lightning protection sys-
tem
The position the air-termination masts air-termina-
tion rods should chosen that there shad-
ing the modules.008 0. air-termin-
ation rod must least 108 diameter from the PV
module (DIN 62305-3 Suppl.86
0.
Diameter the air-termina-
tion system (m)
Distance between the air-
termination system and the
PV module (m)
0.010 1.6: Minimum distance from the air-termination sys-
tems, avoid core shadow
An air termination rod casting shadow module
Solar radiation
Air-termination rod
PV system
TBS
Blitzschutz-Leitfaden
2018
/
en
/
2020/01/10
14:42:40
14:42:40
(LLExport_02613)
/
2020/01/10
14:42:54
14:42:54
203
Chapter The internal lightning protection system
.016 1. core shadow can cause per-
formance reductions the whole string.08
0.
Note that the system must remain the protection
area the air-termination rod