Take great care not to
damage the devices inside.
.
Fig.OBO Bettermann
Mounting and installation
∅ mm
M20
Fig. 12: Drilling the M20 opening
1. Drill the opening for the M20 pressure compensation element from
the outer side the box using stepped drill. Mount the pressure compensation element the drilled opening. 13: Mounting the pressure compensation element
2