Poznámky redaktora
– The technical data the charging station and the network data the
mounting location must agree.OBO Bettermann
Mounting and installation
6 Mounting and installation
6.
– Ambient temperature –10 . When mounting wood, mount
additional protection made non-combustible material, e.
– Only mount the charging unit flat surface made concrete, tiles
or other non-combustible materials.
– Mount the charging station wall interior areas protected
exterior areas. metal
plate, between the charging station and the wooden substrate.1 Criteria for location selection
When selecting the mounting location, observe the following criteria, in
order guarantee safe operation the charging station:
– Take into account the risk flooding, local fire prevention measures,
accident prevention regulations and rescue routes the location.
– Observe the load capacity the wall upon which the charging station
is mounted.
– not mount the charging station the vicinity sources interfer-
ence heat, such frequency converters.
– addition, choose the position the charging station agreement
with the user. 2034680).g. The pressure compensation unit must ordered sep-
arately (item no. These can interfere with
the operation the charging station.
.
– Mount the charging station maximum geographic mounting height
of 2,000 above sea level. protect the charging station, mount the separately
available weather protection roof the protected exterior area. Mount-
ing lightweight construction walls not permitted.
– not mount the charging station potentially explosive areas, and
areas with direct sunlight, heat water jets.
– Only mount the charging station vertical position and observe the
minimum distances other components walls and the maximum
distance between the charging station and the electric vehicle.
– strong temperature deviations and heat bridges are expected
in interior areas, then pressure compensation element must also
be used here, order avoid the formation condensation the
charging unit. Dur-
ing mounting the protected exterior area, you should also use the
pressure compensation element (contained the scope delivery of
the weather protection roof). doing, observe the position the charging point
on the car and the normal parking behaviour, order guarantee a
sufficient cable length