Ion Basic charging station

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: OBO BETTERMANN s. r. o.

Strana 15 z 40







Poznámky redaktora
– Preparation the enabling contact (see „Tab.EN Mounting instructions for the Ion charging stations Mounting and installation ≤ 4,5 m ≥ 900 mm ≥ 200 200 mm ≥ 200 mm 85 mm 55 mm Fig. – Installation additional type fault current protection switch (RDC) the building installation. supply line lengths over m. – Modbus communication currently required, then preparation with pipe duct, etc. recommended for later installation. Additional lightning protection measures may required, depending on the installation conditions, e. This must selected according the output the charging station. – Preparation the data cable (Modbus), necessary, installation a terminating resistor (e. The on-site factors must always taken into account during installation. – Preparation the supply line. LED status display- Potential-free enabling contact for Ion Basic charging stations“ on page 10). 150 ohm). Distances maintained 6. If the installation conditions change, may also necessary adjust the installation the charging station.2 Preparations for mounting Before mounting the charging station, the following preparatory work must performed: – Installation additional circuit breaker with trigger character- istic the building installation.g. .g