Poznámky redaktora
2 Preparations for mounting
Before mounting the charging station, the following preparatory work
must performed:
– Installation additional circuit breaker with trigger character-
istic the building installation.
– Preparation the enabling contact (see „Tab. supply line lengths over m. 150 ohm).
– Installation additional type fault current protection switch
(RDC) the building installation.g.
If the installation conditions change, may also necessary adjust
the installation the charging station.
– Modbus communication currently required, then preparation
with pipe duct, etc.
– Preparation the data cable (Modbus), necessary, installation a
terminating resistor (e.
.EN
Mounting instructions for the Ion charging stations
Mounting and installation
≤
4,5
m
≥
900
mm
≥ 200 200 mm
≥
200
mm
85 mm
55 mm
Fig. LED status display-
Potential-free enabling contact for Ion Basic charging stations“ on
page 10). recommended for later installation. This must selected according the
output the charging station.
Additional lightning protection measures may required, depending on
the installation conditions, e. Distances maintained
6.g.
The on-site factors must always taken into account during installation.
– Preparation the supply line