Mounting instructions for the Ion charging stations
Mounting and installation
≤
4,5
m
≥
900
mm
≥ 200 200 mm
≥
200
mm
85 mm
55 mm
Fig.
– Installation additional type fault current protection switch
(RDC) the building installation. supply line lengths over m.
– Modbus communication currently required, then preparation
with pipe duct, etc. recommended for later installation.
Additional lightning protection measures may required, depending on
the installation conditions, e. This must selected according the
output the charging station.
– Preparation the data cable (Modbus), necessary, installation a
terminating resistor (e.
The on-site factors must always taken into account during installation.
– Preparation the supply line. LED status display-
Potential-free enabling contact for Ion Basic charging stations“ on
page 10). 150 ohm). Distances maintained
6.
If the installation conditions change, may also necessary adjust
the installation the charging station.2 Preparations for mounting
Before mounting the charging station, the following preparatory work
must performed:
– Installation additional circuit breaker with trigger character-
istic the building installation.g.