Poznámky redaktora
. Distances maintained
6.
– Preparation the data cable (Modbus), necessary, installation a
terminating resistor (e.
– Installation additional type fault current protection switch
(RDC) the building installation. supply line lengths over m.
The on-site factors must always taken into account during installation. 150 ohm).
– Modbus communication currently required, then preparation
with pipe duct, etc.
– Preparation the supply line.
– Preparation the enabling contact (see „Tab. This must selected according the
output the charging station.
Additional lightning protection measures may required, depending on
the installation conditions, e.g.
If the installation conditions change, may also necessary adjust
the installation the charging station.2 Preparations for mounting
Before mounting the charging station, the following preparatory work
must performed:
– Installation additional circuit breaker with trigger character-
istic the building installation.EN
Mounting instructions for the Ion charging stations
Mounting and installation
≤
4,5
m
≥
900
mm
≥ 200 200 mm
≥
200
mm
85 mm
55 mm
Fig. LED status display-
Potential-free enabling contact for Ion Basic charging stations“ on
page 10). recommended for later installation.g