Ion Basic charging station

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: OBO BETTERMANN s. r. o.

Strana 15 z 40







Poznámky redaktora
LED status display- Potential-free enabling contact for Ion Basic charging stations“ on page 10). – Preparation the supply line. The on-site factors must always taken into account during installation. supply line lengths over m. If the installation conditions change, may also necessary adjust the installation the charging station. 150 ohm).EN Mounting instructions for the Ion charging stations Mounting and installation ≤ 4,5 m ≥ 900 mm ≥ 200 200 mm ≥ 200 mm 85 mm 55 mm Fig. Distances maintained 6. recommended for later installation. – Preparation the data cable (Modbus), necessary, installation a terminating resistor (e. Additional lightning protection measures may required, depending on the installation conditions, e. – Modbus communication currently required, then preparation with pipe duct, etc. – Installation additional type fault current protection switch (RDC) the building installation.g. . This must selected according the output the charging station.g.2 Preparations for mounting Before mounting the charging station, the following preparatory work must performed: – Installation additional circuit breaker with trigger character- istic the building installation. – Preparation the enabling contact (see „Tab