Ion Basic charging station

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: OBO BETTERMANN s. r. o.

Strana 15 z 40







Poznámky redaktora
2 Preparations for mounting Before mounting the charging station, the following preparatory work must performed: – Installation additional circuit breaker with trigger character- istic the building installation. – Preparation the enabling contact (see „Tab. supply line lengths over m. 150 ohm). – Installation additional type fault current protection switch (RDC) the building installation.g. If the installation conditions change, may also necessary adjust the installation the charging station. – Modbus communication currently required, then preparation with pipe duct, etc. – Preparation the data cable (Modbus), necessary, installation a terminating resistor (e. .EN Mounting instructions for the Ion charging stations Mounting and installation ≤ 4,5 m ≥ 900 mm ≥ 200 200 mm ≥ 200 mm 85 mm 55 mm Fig. LED status display- Potential-free enabling contact for Ion Basic charging stations“ on page 10). recommended for later installation. This must selected according the output the charging station. Additional lightning protection measures may required, depending on the installation conditions, e. Distances maintained 6.g. The on-site factors must always taken into account during installation. – Preparation the supply line