1.5 Mounting the pressure compensation element“ page 21. the weather protection roof mounted,
the supply cable ideally inserted from below.OBO Bettermann
Mounting and installation
„6.4 Connecting the charging station
Work energised parts poses the risk electric shock with lethal
injuries. Before connecting the charging station, de-energisation must
be guaranteed switching off the miniature circuit breaker.
6. Break out the knock-out entry insert the supply cable with slotted
screwdriver.
Fig. 7:
∅ mm
Ion Basic/Key charging station:
∅ mm
Ion Basic Protect/Key Protect
charging station:
Opening knock-out entry
The supply cable can run into the charging station from above be-
low through knock-out entry. The voltage
may only turned again when the charging station fully mounted