OBO Bettermann
Mounting and installation
„6. Break out the knock-out entry insert the supply cable with slotted
screwdriver.
6. Before connecting the charging station, de-energisation must
be guaranteed switching off the miniature circuit breaker.
Fig. The voltage
may only turned again when the charging station fully mounted
with panel.
1.
. the weather protection roof mounted,
the supply cable ideally inserted from below. 7:
∅ mm
Ion Basic/Key charging station:
∅ mm
Ion Basic Protect/Key Protect
charging station:
Opening knock-out entry
The supply cable can run into the charging station from above be-
low through knock-out entry.5 Mounting the pressure compensation element“ page 21.4 Connecting the charging station
Work energised parts poses the risk electric shock with lethal
injuries