Ion Basic charging station

| Kategorie: Návody k obsluze Montážní návody  | Tento dokument chci!

Vydal: OBO BETTERMANN s. r. o.

Strana 21 z 40







Poznámky redaktora
11: Inserting data cable 2. . Insert the data cable into the charging station through the cable gland. The M20 pressure compensation element can inserted into the charg- ing station from above below, depending whether M12 cable gland for one data cable mounted one the openings.5 Mounting the pressure compensation element If the weather protection roof mounted the protected exterior area, then the supplied M20 pressure compensation element must also be mounted. 6. 3. strong temperature deviations and heat bridges are be expected interior areas, then pressure compensation element must also used here, order avoid the formation condensation the charging unit.EN Mounting instructions for the Ion charging stations Mounting and installation Fig. 4. Connect the data cable the RSA and RSB inputs. Mount the supplied M12 cable gland the drilled opening