11: Inserting data cable
2.
. Insert the data cable into the charging station through the cable gland.
The M20 pressure compensation element can inserted into the charg-
ing station from above below, depending whether M12 cable
gland for one data cable mounted one the openings.5 Mounting the pressure compensation element
If the weather protection roof mounted the protected exterior area,
then the supplied M20 pressure compensation element must also be
mounted.
6.
3. strong temperature deviations and heat bridges are be
expected interior areas, then pressure compensation element must
also used here, order avoid the formation condensation the
charging unit.EN
Mounting instructions for the Ion charging stations
Mounting and installation
Fig.
4. Connect the data cable the RSA and RSB inputs. Mount the supplied M12 cable gland the drilled opening