Ures Calculated zero sequence voltage Une the resonance point (Ipos Ires)
Alternative for
Ires, Iw, Ures:
Ires Last measured calculated coil position which the maximum zero
sequence voltage (Ures) was found
d Grid damping specified activated fixed coil can taken
into account (configurable)
k Calculated grid unbalance
.
Ipos Current coil position that was measured and linearized using the
potentiometer.4.g. When fixed coil activated, there option display it
on the screen., the current that was ac-
tually measured across the current transformer the P-coil A)
Ires Last measured calculated coil position which the maximum zero
sequence voltage (Ures) was found
Iw Calculated active current component across the faulty section when a
low impedance earth fault occurs.Page 45
Operating the REG-DP directly
9.2 <F3> Detailed view:
The screen displays the following information:
0 Regulator status
0 Measured value for the zero sequence voltage Uen absolute value and angle
0 Current coil position Ipos
0 Calculated detuning v
0 Current measured across converter absolute value and angle
0 Calculated curve parameters Ires, and Ures
Parameters Description
Uen Current measured zero sequence voltage Une relation 100 as
secondary voltage the voltage transformer primary voltage in
kV.
v Current detuning relation the resonance point that was measured or
calculated during the last search process
I1 Measured current for current transformer (e.1