Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 210 z 272

Jak získat tento dokument?






Poznámky redaktora
If, for example, the phase Uen the REG-DP/ REG-DPA and Uen the current injection controller (CIC) are different, the phase the U-sync-UneDPA input automatically rotated until the absolute value and the phase match each other. Here, you can select au- tomatic testing. One the Commissioning menu’s submenus 'Current injection'. The reversed polarity channel displayed under 'Polarity measurement inputs'. If the polarity this channel reversed, automatic test will detect and correct it. Current injection still after the test has finished and must switched off pressing the 'OFF' key.1 can also performed directly the REG-DP/ REG-DPA. The values for Une (Uns) the current injection controller can viewed the second line (in red). In the example, Une (Uns) connected channel the current injection controller. 13.9.2 Testing the REG-DP/ REG-DPA The automatic polarity test for the measurement channels for the current injection de- scribed Chapter 13.Page 210 Commissioning current injection We take care it. Current injection also switched off when you exit the service screen. . The test can stopped any time pressing the 'OFF' key. Une for the current injection controller and for the REG-DP/ REG-DPA must always be measured the same spot.9