Petersenova cívka s regulátorem REG-DP

| Kategorie: Leták / Datasheet  |

Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 210 z 272

Jak získat tento dokument?






Poznámky redaktora
. Here, you can select au- tomatic testing. In the example, Une (Uns) connected channel the current injection controller. The test can stopped any time pressing the 'OFF' key.Page 210 Commissioning current injection We take care it.1 can also performed directly the REG-DP/ REG-DPA. If, for example, the phase Uen the REG-DP/ REG-DPA and Uen the current injection controller (CIC) are different, the phase the U-sync-UneDPA input automatically rotated until the absolute value and the phase match each other. Une for the current injection controller and for the REG-DP/ REG-DPA must always be measured the same spot. One the Commissioning menu’s submenus 'Current injection'. Current injection also switched off when you exit the service screen.2 Testing the REG-DP/ REG-DPA The automatic polarity test for the measurement channels for the current injection de- scribed Chapter 13. If the polarity this channel reversed, automatic test will detect and correct it. The reversed polarity channel displayed under 'Polarity measurement inputs'. 13.9.9. Current injection still after the test has finished and must switched off pressing the 'OFF' key. The values for Une (Uns) the current injection controller can viewed the second line (in red)