Petersenova cívka s regulátorem REG-DP

| Kategorie: Leták / Datasheet  |

Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 262 z 272

Jak získat tento dokument?






Poznámky redaktora
3. REG-DP device with SDRAM and soldered battery (before 09/2013) In these devices, the battery buffer for the SDRAM and the real-time clock.  Back the parameters (see Chapter 10.  the battery has replaced on-site, must replaced trained and qualified personnel compliance with EMC Directives.Page 262 Maintenance/Cleaning We take care it. Parameters are lost when the battery removed, which why the parameters have backed up before replacing the battery.6 type CR14250 1/2AA with soldering lugs (Order No.0001) Service life: When the REG-DP (no auxiliary voltage) storage years In operation duty cycle 50% years NOTE! Mechanical/thermal damage the CPU circuit board! Destruction the conductor paths and/or the soldering pads  recommended have the battery changed the factory. Required battery: Lithium 3.2. 570. .6) before removing the battery. Parameters are lost removal the battery!  Connect the new battery before removing the spent one