Petersenova cívka s regulátorem REG-DP

| Kategorie: Leták / Datasheet  |

Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 262 z 272

Jak získat tento dokument?






Poznámky redaktora
 the battery has replaced on-site, must replaced trained and qualified personnel compliance with EMC Directives.3.6) before removing the battery. Parameters are lost when the battery removed, which why the parameters have backed up before replacing the battery.2. 570.0001) Service life: When the REG-DP (no auxiliary voltage) storage years In operation duty cycle 50% years NOTE! Mechanical/thermal damage the CPU circuit board! Destruction the conductor paths and/or the soldering pads  recommended have the battery changed the factory. . Required battery: Lithium 3.  Back the parameters (see Chapter 10.6 type CR14250 1/2AA with soldering lugs (Order No. Parameters are lost removal the battery!  Connect the new battery before removing the spent one. REG-DP device with SDRAM and soldered battery (before 09/2013) In these devices, the battery buffer for the SDRAM and the real-time clock.Page 262 Maintenance/Cleaning We take care it