Petersenova cívka s regulátorem REG-DP

| Kategorie: Leták / Datasheet  |

Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 262 z 272

Jak získat tento dokument?






Poznámky redaktora
0001) Service life: When the REG-DP (no auxiliary voltage) storage years In operation duty cycle 50% years NOTE! Mechanical/thermal damage the CPU circuit board! Destruction the conductor paths and/or the soldering pads  recommended have the battery changed the factory.3. Required battery: Lithium 3.Page 262 Maintenance/Cleaning We take care it.6) before removing the battery. REG-DP device with SDRAM and soldered battery (before 09/2013) In these devices, the battery buffer for the SDRAM and the real-time clock. Parameters are lost when the battery removed, which why the parameters have backed up before replacing the battery.2.6 type CR14250 1/2AA with soldering lugs (Order No. . 570.  the battery has replaced on-site, must replaced trained and qualified personnel compliance with EMC Directives. Parameters are lost removal the battery!  Connect the new battery before removing the spent one.  Back the parameters (see Chapter 10