Petersenova cívka s regulátorem REG-DP

| Kategorie: Leták / Datasheet  |

Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 261 z 272

Jak získat tento dokument?






Poznámky redaktora
6 type CR14250 1/2AA with cable and connector (Order No. There are two battery connection points the back the circuit board. Plug connection points and metal cover the outside of the printed circuit board Parallel plugged batteries . This means that the new battery can connected before the spent one is removed.  Back the parameters (see Chapter 10.2.0003 00 Service life: When the REG-DP (no auxiliary voltage) storage years In operation duty cycle 50% years Removing the battery erases the parameters!  Connect the new battery before removing the spent one.3. prevent losing the parameters, place the replacement battery the empty connection point. For safety reasons, recommended back the parameters for these devices. 570.Page 261 Maintenance/Cleaning REG-DP device with SDRAM and plug-in battery (from 05/2009) In these devices, the battery buffer for the SDRAM and the real-time clock. You can then push the new battery into the metal cover. Required battery: Lithium 3.6) before removing the battery. Lift the bat- tery that needs replacing and remove carefully from the metal cover. Parameters are lost when the battery removed, which why the devices have dual connection for the buffer battery