Petersenova cívka s regulátorem REG-DP

| Kategorie: Leták / Datasheet  |

Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 242 z 272

Jak získat tento dokument?






Poznámky redaktora
8 Testing the polarity the measurement channel Once the parameters have been set, they have sent the REG-DP/ REG-DPA.Page 242 Commissioning the HPCI We take care it. Another option reset the regulator the 'Move coil' option and start tuning process. 14.8. On WinEDC's service screen, the REG-DP/ REG-DPA screen expanded with the additional current injection functions. The coil must the grid the latest for the next polarity test realistic results can achieved. The po- larity the used measurement channels can then tested. 14. Figure 170: Service screen with current injection If the aforementioned conditions are met, press the key the highlighted field start the test. Note: When commissioning current injection, the assumption that the coil that regulated by the REG-DP/ REG-DPA already the grid.1 Testing using the WinEDC service screen For the following test, the P-coil must connected the grid and positioned the actual resonance point. The point can determined moving the regulator manually and where the zero se- quence voltage peaks across the coil's whole adjustment range. The regulator must also running MAN mode.