Petersenova cívka s regulátorem REG-DP

| Kategorie: Leták / Datasheet  |

Operating Instructions for the Petersen-Coil Regulator

Vydal: EBERLE Controls GmbH

Strana 206 z 272

Jak získat tento dokument?






Poznámky redaktora
– Measurement point for max. Une CI This where the measurement point defined which the value the zero sequence voltage monitored when current injected. The REG-DP/ REG-DPA only has told which the two devices the information connected to.Page 206 Commissioning current injection We take care it. . The functions that can associated with the relays and LED are the same those in Chapter 11.4.  CAUTION! When using the UnsIci algorithm, Uns the only setting that makes sense! Setting Description Uns Zero sequence voltage directly the P-coil Uod Zero sequence voltage directly the busbar Uci Voltage measured directly where the current injected (usually the PAW). The REG-DP/ REG-DPA receives message one the fuses blows. – Pot connection at The REG-DP/ REG-DPA and the current injection controller each have the possibility con- nect the potentiometer information.1. Setting Description REG-DP (Default) The P-coil's position signal connected the REG-DP’s potentiometer input CI The P-coil's position signal connected the current injection controller's potentiometer input 0 Binary inputs Figure 138: Configuration inputs and standard current injection cabinets Binary input configured with the auxiliary contacts the circuit breakers the current injection. The REG-DP/ REG-DPA sends the summary error (BOF 38) 0 Relay This where the available relays and LEDs for current injection are parameterized.2