GE Energy 1, 2 and 3 GES Energy 1

| Kategorie: Leták / Datasheet  | Tento dokument chci!

Passive Ventilation with Electric Diagram for Optima 100 and Optima 250

Autor: Genvex A/S

Strana 7 z 18

Jak získat tento dokument?






Poznámky redaktora
Take care seal the termination where the escaping duct led through the roof or through the gable end, order avoid condensation damage. From the siphon and the internal outlet there must be a necessary fall 1%. B Faulty duct insulation Condensate drain The units produce litres condensate per day. Insulation ducts cold loft spaces In order exploit the unit’s high recovery potential (efficiency), necessary insulate the ducts correctly. the ducts are laid the rafter foot, alternative B may used. The condensate drain must be fitted with water trap there negative pressure the chamber which the condensate tray mounted. Use armed water hose between the drain connecting piece the unit and the siphon and tightend both ends with collar band. Duct insulation, alt. The insulation must always tightly packed round the ducts. If the unit installed cold loft space, the condensate drain pipe must insulated prevent freezing the condensate the pipe. Fresh air and escaping ducts cold spaces: It recommended that fresh air and escaping ducts are insulated with minimum insulation.7Subject Technical Modifications Energy and 3/GES Energy 1 100 mmSiphon To internal drain Extract AirFresh Air Supply AirExhaust Air Lack water siphon water damage 1% Duct insulation, alt. If installation problems make impossible secure the condensate drain pipe from freezing insulation, will be necessary mount thermostat-controlled heating tape round the condensate drain pipe. The fresh air duct insulated prevent warm air the loft in summer from heating the fresh air. It is therefore important that the condensate drain correctly executed and that the unit has slight fall towards the condensate drain. However, recommended that the water trap installed heated space below to ensure that the water does not freeze. insulation form alternative used, recommended that executed with two layers lamella mats with paper foil externally and with staggered joints between the two layers. Supply and extract ducts: To minimise heat losses from the duct system cold loft spaces, the supply and extract ducts must insulated with minimum 100 insulation. GE Energy 3 Bund Bagside Condensate drain Condensate drain GES Energy 1 Bottom Back . The condensate drain pipe must air tight for example by bending copper pipe siphon (see sketch the left)