Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 368 z 399

Jak získat tento dokument?






Poznámky redaktora
Remove the test link and record the results schedule test results such as that given Appendix the IEE Regulations. For satisfactory test result the ohmmeter continuity meter should read very close zero for each test. Switch off the supply the main switch. Lights Switches Sockets Link L N Tester C C C FIGURE 14. 2. Test between the centre pin any Edison screw lampholders and any convenient earth connection. Fix temporary link between the line and earth connections the consumer’s side the main switch. 6. 5. For this type sup- ply necessary sink earth electrode into the general mass earth, which then forms part the earth return conjunction with RCD. Remove all lamps and appliances. 5 Testing earth electrode resistance (612. 3. Test between the ‘common’ terminal and earth each switch position. Test between the live pin (i. .e.71 Polarity test.7) Low-voltage supplies having earthing arrangements which are indepen- dent the supply cable are classified systems.71. 4. 14. the pin the right earth) and earth at each socket outlet shown Fig.Electrical installations and wiring systems 357 The test done with the supply disconnected using ohmmeter con- tinuity tester follows: 1