Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 367 z 399

Jak získat tento dokument?






Poznámky redaktora
Close all switches and circuit breakers.3. Disconnect appliances. Where the circuit includes electronic equipment which might damaged by the insulation resistance test, measurement between all live conduc- tors (i. 3.3.0MΩ (IEE Regulation 612. Between line conductors 1. The procedures are: Phase and neutral conductors earth 1.c.e. These are line and neutral conductors earth and between line conductors. for 230 and 400 installa- tions. 4. There are two tests carried out using insulation resistance tester which must have test voltage 500 d.2).6) The object this test verify that all fuses, circuit breakers and switches are connected the line live conductor only, and that all socket outlets are correctly wired and Edison screw-type lampholders have the centre contact connected the live conductor. live and neutral conductors connected together) and the earthing arrangements may made. The insulation resistance readings for each test must not less than 1. 3.0MΩ complies with the Regulations, the IEE Guidance Notes tell that much higher values than this can expected and that reading less than 2MΩ might indicate a latent but not yet visible fault the installation.70 Insulation resistance test. Although insulation resistance reading 1. 2. 4 Testing polarity (612.70(a). Disconnect appliances. important make polarity test the installation since visual inspection will only indicate conduc- tor identification. 2. Test separately between the line conductor and earth, and between the neutral conductor and earth, for every distribution circuit the consumer’s unit shown Fig.0MΩ for satisfactory result (IEE Regulation 612. Remove all lamps.Basic Electrical Installation Work 356 should disconnected, since they will respectively glow, charge be damaged the test. Close all switches and circuit breakers. To final circuits L N Tester (b) .3). 14. The insulation resistance these tests should be not less than 1. Remove all lamps.70(b) and record the result. Record the results a schedule test results such that given Appendix the IEE Regulations. these cases each circuit should separately tested obtain reading greater than 2MΩ. 4. Test between line and neutral conductors every distribution circuit at the consumer’s unit shown Fig. 14. To final circuits L N Tester (a) FIGURE 14