Close all switches and circuit breakers. 14. important make polarity
test the installation since visual inspection will only indicate conduc-
tor identification.70
Insulation resistance test.
3.e.70(a). Disconnect appliances.0MΩ (IEE Regulation 612. 14.
Where the circuit includes electronic equipment which might damaged
by the insulation resistance test, measurement between all live conduc-
tors (i.
2.
Between line conductors
1. live and neutral conductors connected together) and the earthing
arrangements may made. Test separately between the line conductor and earth, and between
the neutral conductor and earth, for every distribution circuit the
consumer’s unit shown Fig.
4 Testing polarity (612. Remove all lamps.
To final circuits
L N
Tester
(b)
.
4. These are line and neutral conductors earth and between line
conductors. The insulation resistance these tests should
be not less than 1.3). Close all switches and circuit breakers.c.
To final circuits
L N
Tester
(a)
FIGURE 14.
4.
Although insulation resistance reading 1.0MΩ complies with the
Regulations, the IEE Guidance Notes tell that much higher values than
this can expected and that reading less than 2MΩ might indicate a
latent but not yet visible fault the installation.
The insulation resistance readings for each test must not less than
1. Disconnect appliances.0MΩ for satisfactory result (IEE Regulation 612.Basic Electrical Installation Work
356
should disconnected, since they will respectively glow, charge be
damaged the test.2).3.
3.6)
The object this test verify that all fuses, circuit breakers and switches
are connected the line live conductor only, and that all socket outlets
are correctly wired and Edison screw-type lampholders have the centre
contact connected the live conductor.
2.3. The procedures are:
Phase and neutral conductors earth
1. for 230 and 400 installa-
tions. Test between line and neutral conductors every distribution circuit
at the consumer’s unit shown Fig.70(b) and record the result. these cases each circuit
should separately tested obtain reading greater than 2MΩ. Record the results a
schedule test results such that given Appendix the IEE
Regulations.
There are two tests carried out using insulation resistance tester
which must have test voltage 500 d. Remove all lamps