Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 370 z 399

Jak získat tento dokument?






Poznámky redaktora
The RCD should not trip within 2s. When carrying out the test, all loads normally supplied through the device are disconnected. Certification and reporting Following the inspection and testing installation, certificate should be given the electrical contractor responsible person the person ordering the work (Chapters and the IEE Regulations). in Chapter 12. Using the standard lead supplied with the test instrument, disconnect all other loads and plug the test lead the socket the centre of the ring (i.13) The object the test verify the effectiveness the RCD, that oper- ating with the correct sensitivity and proving the integrity the electrical and mechanical elements. Record the highest value these two results schedule test results such as that given Appendix the IEE Regulations. The test must simulate appropriate fault con- dition and independent any test facility incorporated the device. . 2. the socket the furthest point from the source supply). 8 Additional Protection: testing RCD: Supply connected (612.e.2. If the RCD fails any the above tests should changed for new one. Where the RCD has rated tripping current not exceeding 30mA and has been installed reduce the risk associated with ‘basic’ and ‘fault’ protection indicated Regulation 411. Change the phase angle from 180° and press the test button once again.Electrical installations and wiring systems 359 Purpose-built testers give readout ohms and satisfactory result is obtained when the loop impedance does not exceed the appropriate val- ues given Tables 41. The RCD should again trip within 200ms. 3. This test should repeated every 3 months. 6. Press the test button the RCD should trip and disconnect the sup- ply within 200ms. This test testing the RCD for inconvenience nuisance tripping. 4. 5. Set the test instrument the tripping current the device and a phase angle 0°.2 and 41.1, residual current 150mA should cause the circuit breaker open within 40ms. Finally, the effective operation the test button incorporated within the RCD should tested prove the integrity the mechanical elements the tripping device. The testing ring circuit protected general-purpose RCD EN 61008 split-board consumer unit carried out follows: 1. Now set the test instrument 50% the rated tripping current of the RCD and press the test button.3 the IEE Regulations, see also Table 12