each case the voltmeter test lamp should indicate the supply voltage for satisfactory result.9) The object this test verify that the impedance the whole earth fault current loop line earth low enough allow the overcurrent pro- tective device operate within the disconnection time requirements of Regulations 411. The test will, most cases, done with purpose-made line earth loop impedance tester which circulates current excess 10A around the loop for very short time, reducing the danger faulty circuit.2. Using line earth loop impedance tester, test between the incoming line conductor and the earth electrode.4. 3. The test made with the supply switched on, and carried out from the furthest point every final circuit, including lighting, socket outlets and any fixed appliances.2 and 411. .Basic Electrical Installation Work 358 To verify the resistance electrode used this way, the following test method may applied: 1. Test from the common terminal switches earth, the live pin each socket outlet earth and the centre pin any Edison screw lampholders to earth. 4. The IEE Guidance Note tells that acceptable value for the measure- ment the earth electrode resistance will about 200 less.6 and should fault occur. The whole earth fault current loop examined this test comprised all the installation protective conductors, the protective earthing terminal and protective conductors, the earthed neutral point and the secondary wind- ing the supply transformer and the line conductor from the transformer to the point the fault the installation. 6 Testing polarity: Supply connected Using approved voltmeter test lamp and probes which comply with the HSE Guidance Note GS38, again carry out polarity test verify that all fuses, circuit breakers and switches are connected the live conductor. 7 Testing earth fault loop impedance (supply connected) (612. Reconnect the protective bonding conductors when the test is completed. Record the result schedule test results such that given in Appendix the IEE Regulations. Record the results schedule test results. 2. Switch off the consumer’s unit isolate the installation. Disconnect the installation protective equipotential bonding from the earth electrode ensure that the test current passes only through the earth electrode.3. Providing the first five tests were satisfactory, the supply may now be switched and the final tests completed with the supply connected