ohmmeter reading should then be taken between live and earth every socket outlet the ring.68 Step test: connection mains conductors and test circuit conditions.13.Electrical installations and wiring systems 355 half the live and neutral ohmmeter readings measured step this test. Neon lamps, capacitors and electronic circuits L1 N2 L2 L1 N2 N1 E2 E1 Ohm- meter FIGURE 14. . The test should be made the consumer’s unit with the mains switch off, all fuses place and all switches closed. This value equal for the circuit.13).3) The object the test verify that the quality the insulation sat- isfactory and has not deteriorated short circuited.13. Record the results table such that shown Table 14.69 Step test: connection mains conductors and test circuit conditions. The read- ings obtained should substantially the same provided that there are no breaks multiple loops the ring. Step 3 Where the CPC wired ring, for example where twin and earth cables or plastic conduit used wire the ring, temporarily join the live and CPCs together shown Fig. 3 Testing insulation resistance (612. 14. Record the results installation schedule such that given in Appendix the IEE Regulations table such that shown Table 14. Sockets connected spur will have slightly higher value resistance because they are fed only one cable, while each socket the ring fed by two cables. The step value should equal (r1 r2)/4, where r1 and are the ohmmeter readings from step this test (see Table 14. L1 N2 L2 L1 N2 N1 E2 E1 Ohm- meter FIGURE 14.69