Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 366 z 399

Jak získat tento dokument?






Poznámky redaktora
Step 3 Where the CPC wired ring, for example where twin and earth cables or plastic conduit used wire the ring, temporarily join the live and CPCs together shown Fig. Neon lamps, capacitors and electronic circuits L1 N2 L2 L1 N2 N1 E2 E1 Ohm- meter FIGURE 14.69 Step test: connection mains conductors and test circuit conditions. 3 Testing insulation resistance (612. The test should be made the consumer’s unit with the mains switch off, all fuses place and all switches closed. Record the results installation schedule such that given in Appendix the IEE Regulations table such that shown Table 14.13. This value equal for the circuit. The step value should equal (r1 r2)/4, where r1 and are the ohmmeter readings from step this test (see Table 14. The read- ings obtained should substantially the same provided that there are no breaks multiple loops the ring.3) The object the test verify that the quality the insulation sat- isfactory and has not deteriorated short circuited. Sockets connected spur will have slightly higher value resistance because they are fed only one cable, while each socket the ring fed by two cables.69. ohmmeter reading should then be taken between live and earth every socket outlet the ring. L1 N2 L2 L1 N2 N1 E2 E1 Ohm- meter FIGURE 14.68 Step test: connection mains conductors and test circuit conditions. Record the results table such that shown Table 14.13.13).Electrical installations and wiring systems 355 half the live and neutral ohmmeter readings measured step this test. . 14