Earth fault duration Summary time the earth faults including transient earth faults
Current injection Period during which the was active
Search Number started search processes
Tuned Number successful tuning processes
.4.1 Displaying statistics
The statistics are displayed summary statistics statistics calendar weeks (CW). the value changes more
than the resolution that set the recorder (in %), the new value used for the record-
ing.
9. Press <F1> use the <> and <>
arrow keys scroll the different values displayed the below table.Page Operating the REG-DP directly
We take care it.
The following data are recoded statistics:
Parameters Description
Automatic Summary time Automatic mode: Overflow 100 000 h
Automatically switches the output days: d
Motor Summary time the adjustment commands 'Higher' and 'Lower'
The P-coil's 'Mot_Run' entry also taken into account.
Press <F3> switch between the different screens.4. This recording guarantees good resolution even for small zero sequence voltages
Standard allocation for the left channel: Ipos
<F2> Channel right graph (screen 2):
The options are the same for channel 1
Standard allocation for the right channel: Une
<F4> Channel (hidden) (screen 2):
Additional information can stored this channel, for example, the angle information of
the zero sequence voltage Une.
The zero sequence voltage Une stored logarithmically and displayed logarithmic
scale.4.4 Statistics
9.
<F3> used set the threshold that triggers new recording.
Standard allocation for the hidden channel: Angle Une
1 Caution:
When the value that set recorded recording channel changed, all the data
in the recorder are deleted.
Measured value Description
I2_Phi Angle the current I2, relation Usync
Ipos Coil position A
Usync Absolute value the synchronization voltage