Catalogue 2019 Intelligent building technology by Gira

| Kategorie: Katalog  | Tento dokument chci!

Vydal: SBS ELEKTRO s.r.o.

Strana 657 z 696







Poznámky redaktora
 g.6). This enables the simulta- neous down movement the connected motors (e. The line may not laid together with 230V cables (risk interference). (4) (1) (2) (3) Connection blind controller insert with “central control” The connection several phases enables the central control be installed another level another room. Note As long raise command active auxiliary input “2”, the blind cannot operated manually automatically the device itself. . Motors M1 (insert (2)) and (insert (3)) can also operated manually via the con- trol buttons. Note Glass-breakage sensors may not used together with the wind sensor. g.655 Gira electrical installation systems Inserts sensors Blind controller I Technical information Connection group control central control (1) (2) (3) Connection blind controller insert with “group control” For example: Insert (1) with electronic blind controller. Observe connection values the circuit breakers. The wind-protection function (blind moves up) is blocked after glass broken and the blind shutter remains closed. The switching commands are evaluated the same way for both motors. When connecting the wind sensor, use shielded line (we recommend JY-ST-Y 0. This locking remains effect long raise com- mand active auxiliary input “2”. The wind sensor must attached position that conducive wind- speed measurement. Additional inserts can added, accordance with the wiring diagram. Note As long raise command active auxiliary input “2”, the blind cannot operated manually automatically the device itself. Insert (4) with elec- tronic blind controller. Motors (insert (2)) and (insert (3)) are operated manually via the control buttons. Example with two blind motors: Insert (1), (2) and (3) with control button. The automatic and manual control both motors is performed “centrally” via insert (1) with electronic blind controller. The automatic and manual control both motors additionally carried out “centrally” via insert (4) with electronic blind controller. central raise command the morning and central lower command the evening for all connected blind motors). This enables joint down movement the connected motors (e. Both motors are operated simultaneously via insert (1). The switching commands are evaluated the same way for both motors. Observe connection values the circuit breakers. AC 230 V~ AC 230 V~ AC 230 V~ 0398 00 1 0398 0398 0398 00 0398 0398 0398 00 2 3 4 5 Connection blind controller wind alarm (central control with two groups) With wind alarm, the blind raised and remains locked there until the wind dies down. Insert (2) and (3) with control button. Connection wind alarm Connection blind controller wind alarm Wind sensor (cup anemometer) The wind sensor installed the roof the side the building. Additional inserts can added, accordance with the wiring diagram. central raise command the morning and central lower command the evening for all connected blind motors). For this reason, the blind cannot be operated manually automatically. not install location that sheltered from the wind. Ensure attachment the correct position