Catalogue 2019 Intelligent building technology by Gira

| Kategorie: Katalog  | Tento dokument chci!

Vydal: SBS ELEKTRO s.r.o.

Strana 657 z 696







Poznámky redaktora
Motors (insert (2)) and (insert (3)) are operated manually via the control buttons. The switching commands are evaluated the same way for both motors. The wind sensor must attached position that conducive wind- speed measurement. AC 230 V~ AC 230 V~ AC 230 V~ 0398 00 1 0398 0398 0398 00 0398 0398 0398 00 2 3 4 5 Connection blind controller wind alarm (central control with two groups) With wind alarm, the blind raised and remains locked there until the wind dies down. When connecting the wind sensor, use shielded line (we recommend JY-ST-Y 0. The wind-protection function (blind moves up) is blocked after glass broken and the blind shutter remains closed. Insert (4) with elec- tronic blind controller. Observe connection values the circuit breakers. g. Note Glass-breakage sensors may not used together with the wind sensor. This enables joint down movement the connected motors (e. .655 Gira electrical installation systems Inserts sensors Blind controller I Technical information Connection group control central control (1) (2) (3) Connection blind controller insert with “group control” For example: Insert (1) with electronic blind controller. Note As long raise command active auxiliary input “2”, the blind cannot operated manually automatically the device itself. Both motors are operated simultaneously via insert (1). This enables the simulta- neous down movement the connected motors (e. not install location that sheltered from the wind.6). For this reason, the blind cannot be operated manually automatically. central raise command the morning and central lower command the evening for all connected blind motors). Motors M1 (insert (2)) and (insert (3)) can also operated manually via the con- trol buttons. central raise command the morning and central lower command the evening for all connected blind motors). Additional inserts can added, accordance with the wiring diagram. Additional inserts can added, accordance with the wiring diagram. Note As long raise command active auxiliary input “2”, the blind cannot operated manually automatically the device itself. (4) (1) (2) (3) Connection blind controller insert with “central control” The connection several phases enables the central control be installed another level another room. Connection wind alarm Connection blind controller wind alarm Wind sensor (cup anemometer) The wind sensor installed the roof the side the building. The automatic and manual control both motors is performed “centrally” via insert (1) with electronic blind controller. Insert (2) and (3) with control button. The line may not laid together with 230V cables (risk interference). The automatic and manual control both motors additionally carried out “centrally” via insert (4) with electronic blind controller. The switching commands are evaluated the same way for both motors. g. This locking remains effect long raise com- mand active auxiliary input “2”. Ensure attachment the correct position. Observe connection values the circuit breakers. Example with two blind motors: Insert (1), (2) and (3) with control button