The HSE Guidance Note tells about suitable test probe leads. Use bullet points list each stage the erection and securing long
extension ladder.
Use sketch identify the main recommendations. Use bullet points list step-by-step safe electrical isolation procedure
for isolating circuit three-phase distribution fuse board. The Electricity Work Regulations absolutely forbid the following work
activity:
a. What proving unit used for?
22.12. testing live electrical systems
c.
13. ‘Good housekeeping’ work about:
a. Describe how you would use mobile scaffold tower re-lamp all the
light fittings supermarket. working height
b. List five common precautions which might taken control risk.
20.
14. putting tools and equipment away after use. making the tea and collecting everyone’s lunch
d.
18. working without the appropriate PPE. cleaning and putting waste the skip
b. List five common categories risk. working safely
c.
17.
19. Use bullet points give step-by-step
account re-lamping the first two fittings. Identify all actions which would make the ladder safe
to use. Use bullet points list the main stages involved lifting heavy box
from the floor, carrying across room and placing worktop,
using safe manual handling technique. Describe safe manual handling technique for moving heavy electric
motor out the stores, across yard and into the back van for
delivery site.
16. live repair work electrical circuits
d.
21.
.
15