working without the appropriate PPE.
16.12.
14. cleaning and putting waste the skip
b.
15.
21.
20. Describe how you would use mobile scaffold tower re-lamp all the
light fittings supermarket.
18.
17. Use bullet points list step-by-step safe electrical isolation procedure
for isolating circuit three-phase distribution fuse board. live repair work electrical circuits
d.
. making the tea and collecting everyone’s lunch
d. Describe safe manual handling technique for moving heavy electric
motor out the stores, across yard and into the back van for
delivery site.
Use sketch identify the main recommendations. working height
b. The Electricity Work Regulations absolutely forbid the following work
activity:
a. Use bullet points list each stage the erection and securing long
extension ladder. List five common precautions which might taken control risk. testing live electrical systems
c.
19. What proving unit used for?
22. ‘Good housekeeping’ work about:
a. List five common categories risk.
13. Identify all actions which would make the ladder safe
to use. The HSE Guidance Note tells about suitable test probe leads. working safely
c. Use bullet points give step-by-step
account re-lamping the first two fittings. putting tools and equipment away after use. Use bullet points list the main stages involved lifting heavy box
from the floor, carrying across room and placing worktop,
using safe manual handling technique