11. The most appropriate piece equipment use for gaining access a
permanent scaffold would be:
a.
9. pair sky hooks. wear appropriate PPE
b. ladder
b. mobile scaffold tower
d. Identify one
from the list below:
a. manual handling. notify the HSE that you intend carry out risk assessment
c. sack truck
d. The Electricity Work Regulations tell that ‘we must ensure the
disconnection and separation electrical equipment from every
source supply and the separation must secure’. trestle scaffold
c. There are five parts hazard risk assessment procedure.177
U W
6 6
2 2
C1
L1 C1
2
C3
4
5
6
To phase supply
To phase motor
7. When working above ground for long periods time the most
appropriate piece equipment use would be:
a. mobile scaffold tower
c. pair sky hooks. hazard risk assessment
c. workstation risk assessment. working height
b. ladder
b. substitute procedure with less risk. safe isolation procedure
d.
8.
10. procedure to
comply with this Regulation called:
a. trestle scaffold
c.
. list the hazards and who might harmed
d. work height
b. mobile scaffold tower
d. Lifting, transporting supporting heavy objects hand bodily force
is one definition of:
a