mobile scaffold tower
d. The most appropriate piece equipment use for gaining access a
permanent scaffold would be:
a. pair sky hooks. procedure to
comply with this Regulation called:
a. hazard risk assessment
c. workstation risk assessment.177
U W
6 6
2 2
C1
L1 C1
2
C3
4
5
6
To phase supply
To phase motor
7. list the hazards and who might harmed
d. wear appropriate PPE
b. There are five parts hazard risk assessment procedure.
8. ladder
b. substitute procedure with less risk. ladder
b. The Electricity Work Regulations tell that ‘we must ensure the
disconnection and separation electrical equipment from every
source supply and the separation must secure’. working height
b. trestle scaffold
c. work height
b. safe isolation procedure
d.
9. Lifting, transporting supporting heavy objects hand bodily force
is one definition of:
a. manual handling. Identify one
from the list below:
a. mobile scaffold tower
c.
11. pair sky hooks. When working above ground for long periods time the most
appropriate piece equipment use would be:
a. sack truck
d. trestle scaffold
c.
. mobile scaffold tower
d.
10. notify the HSE that you intend carry out risk assessment
c