wear appropriate PPE
b. safe isolation procedure
d. workstation risk assessment. working height
b. mobile scaffold tower
c. The most appropriate piece equipment use for gaining access a
permanent scaffold would be:
a.
10. manual handling. mobile scaffold tower
d. notify the HSE that you intend carry out risk assessment
c. pair sky hooks.
8. There are five parts hazard risk assessment procedure. trestle scaffold
c. list the hazards and who might harmed
d. hazard risk assessment
c. pair sky hooks. Lifting, transporting supporting heavy objects hand bodily force
is one definition of:
a. sack truck
d. trestle scaffold
c. substitute procedure with less risk.
.177
U W
6 6
2 2
C1
L1 C1
2
C3
4
5
6
To phase supply
To phase motor
7. work height
b. ladder
b. When working above ground for long periods time the most
appropriate piece equipment use would be:
a.
9.
11. Identify one
from the list below:
a. ladder
b. procedure to
comply with this Regulation called:
a. mobile scaffold tower
d. The Electricity Work Regulations tell that ‘we must ensure the
disconnection and separation electrical equipment from every
source supply and the separation must secure’