Identify one
from the list below:
a. notify the HSE that you intend carry out risk assessment
c. workstation risk assessment. mobile scaffold tower
d.
.
10. pair sky hooks. mobile scaffold tower
d.
9. procedure to
comply with this Regulation called:
a. sack truck
d. working height
b. trestle scaffold
c.177
U W
6 6
2 2
C1
L1 C1
2
C3
4
5
6
To phase supply
To phase motor
7. There are five parts hazard risk assessment procedure.
8. The most appropriate piece equipment use for gaining access a
permanent scaffold would be:
a. list the hazards and who might harmed
d. substitute procedure with less risk. hazard risk assessment
c. mobile scaffold tower
c. safe isolation procedure
d.
11. ladder
b. manual handling. wear appropriate PPE
b. When working above ground for long periods time the most
appropriate piece equipment use would be:
a. trestle scaffold
c. The Electricity Work Regulations tell that ‘we must ensure the
disconnection and separation electrical equipment from every
source supply and the separation must secure’. pair sky hooks. ladder
b. Lifting, transporting supporting heavy objects hand bodily force
is one definition of:
a. work height
b