. working height
b. hazard risk assessment
c. safe isolation procedure
d.
10.
9. When working above ground for long periods time the most
appropriate piece equipment use would be:
a. mobile scaffold tower
c. mobile scaffold tower
d. The most appropriate piece equipment use for gaining access a
permanent scaffold would be:
a.
11. list the hazards and who might harmed
d. pair sky hooks. pair sky hooks. Identify one
from the list below:
a. notify the HSE that you intend carry out risk assessment
c. Lifting, transporting supporting heavy objects hand bodily force
is one definition of:
a. workstation risk assessment. sack truck
d. manual handling. substitute procedure with less risk. There are five parts hazard risk assessment procedure. procedure to
comply with this Regulation called:
a.177
U W
6 6
2 2
C1
L1 C1
2
C3
4
5
6
To phase supply
To phase motor
7. The Electricity Work Regulations tell that ‘we must ensure the
disconnection and separation electrical equipment from every
source supply and the separation must secure’. ladder
b. trestle scaffold
c. work height
b. wear appropriate PPE
b.
8. mobile scaffold tower
d. ladder
b. trestle scaffold
c