Catalogue 2019 Intelligent building technology by Gira

| Kategorie: Katalog  | Tento dokument chci!

Vydal: SBS ELEKTRO s.r.o.

Strana 608 z 696







Poznámky redaktora
The Gira E22/Gira flush- mounted device box screwed in the hollow wall with claws, like a common hollow-wall box. 2. The Gira E22/Gira flush- mounted device box screwed in the flush-mounted device box with claws, like common hollow-wall box. 3. The flush-mounted inserts, cover frames and cover plates are installed the device box the usual manner. The device box can corrected by 3°.606 Gira electrical installation systems Gira E22 Gira flat installation I Technical information Gira E22 Gira E2 Flat installation brickwork 1. Both spacers, which can also be used position spirit level, must completely covered by the plaster. Then remove the plaster protec- tion and cut the box opening clear. 4. 5. Flat installation hollow wall Cut out the rectangular cut-out, mount the grey device box and fasten with claws. The flush-mounted inserts, cover frames and cover plates are installed the device box the usual manner. Produce rectangular cut-out, mount the red Gira E22/Gira E2 flush-mounted device box and, for example, secure with plaster. Installation depth for flat installation masonry min The installation depth the red flush-mounted device box is based the subsequent plaster thickness. max 30 mm Important: The spacers the red Gira E22/ Gira flush-mounted device box must not shortened or removed. Important: Observe the note installation depth. Mount the grey Gira E22/Gira E2 flush-mounted device box the red Gira E22/Gira flush- mounted device box and align. Maximum plaster compensation is 30mm. . Mount the included plaster pro- tection and plaster the wall