Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 65 z 399

Jak získat tento dokument?






Poznámky redaktora
The supplementary agreement this allows the electrical contractor to recoup any value-added tax paid materials interim periods. The combination work and College will provide you with the skills you will need become ‘fully qualified’! . 2.54 Basic Electrical Installation Work Legal contracts Before work commences, some form legal contract should agreed between the two parties, that is, those providing the work (e. The appendix this contains details costings, for example the rate to paid for extras day work, who will responsible for defects, how much the contract tender will retained upon completion and for how long. The articles agreement this names the parties, the proposed building and the date the contract period. 3. The other party, say the main building contractor, agreeing pay the price stated for that work upon completion the installation.g. As trainee, you are probably employed electrical company and attend your local college either ‘Day Release’ ‘Block Release’ scheme. the main building company). A contract formal document which sets out the terms agreement between the two parties. the subcontracting electrical company) and those asking for the work be carried out (e. The contractual conditions this states the rights and obligations of the parties concerned, for example whether there will interim payments for work penalty work not completed time. Professional bodies supporting electrotechnical organizations If you are reading this book would guess that you are electrical trainee working one sector the electrotechnical industry. You hope eventu- ally pass the City Guilds 2330 Parts and qualifications, take your AM2 Practical Assessment and become qualified electrician. standard form building contract typically contains four sections: 1. Believe me, do wish you well, because you are the future the electrotechnical industry.g. In signing the contract, the electrical contractor has agreed carry out the work the appropriate standards the time stated and for the agreed cost. 4. For smaller electrical jobs, verbal contract may agreed, but dispute arises there written evidence what was agreed and then becomes a matter one person’s word against another’s. If dispute arises the contract provides written evidence what was agreed and will form the basis for solution