Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 386 z 399

Jak získat tento dokument?






Poznámky redaktora
The appointed person will also look after the first aid equipment, including re-stocking the first aid box. is used extensively large industrial and commercial installations for sup- porting and SWA cables which are laid the cable tray and secured with cable ties through the tray holes. The test instrument must also carry calibration certificate, otherwise the recorded results may void. Alarm call points Manually operated alarm call points should provided all parts a building where people may present, and should located that no one need walk for more than 30m from any position within the prem- ises order give alarm. Bonding conductor protective conductor providing equipotential bonding. Basic protection Basic protection provided the insulation live parts accordance with Section 416 the IEE Regulations. Cable tray Cable tray sheet-steel channel with multiple holes. Capacitive reactance Capacitive reactance (XC) the opposition a. Bonding The linking together the exposed extraneous metal parts electri- cal installation. All testing must, therefore, carried out using ‘approved’ test instrument the test results are valid. Appointed person appointed person someone who nominated take charge when someone injured becomes ill, including calling ambulance if required.Glossary terms Acceleration Acceleration the rate change velocity with time. Approved test instruments The test instruments and test leads used the electrician for testing an electrical installation must meet all the requirements the relevant regu- lations. Acceleration Velocity Time (m/s 2 Accident accident may defined uncontrolled event causing injury or damage individual property. current capacitive circuit. Alloy alloy mixture two more metals. 375 . The most common finish hot-dipped galvanized but PVC-coated tray also available. causes the current the circuit lead ahead the voltage.c