Alarm call points Manually operated alarm call points should provided all parts a building where people may present, and should located that no one need walk for more than 30m from any position within the prem- ises order give alarm. Cable tray Cable tray sheet-steel channel with multiple holes. current capacitive circuit. Bonding conductor protective conductor providing equipotential bonding. Approved test instruments The test instruments and test leads used the electrician for testing an electrical installation must meet all the requirements the relevant regu- lations. 375 .Glossary terms Acceleration Acceleration the rate change velocity with time. Capacitive reactance Capacitive reactance (XC) the opposition a. Alloy alloy mixture two more metals. causes the current the circuit lead ahead the voltage. Bonding The linking together the exposed extraneous metal parts electri- cal installation. The test instrument must also carry calibration certificate, otherwise the recorded results may void. All testing must, therefore, carried out using ‘approved’ test instrument the test results are valid. Acceleration Velocity Time (m/s 2 Accident accident may defined uncontrolled event causing injury or damage individual property. The appointed person will also look after the first aid equipment, including re-stocking the first aid box. The most common finish hot-dipped galvanized but PVC-coated tray also available. Basic protection Basic protection provided the insulation live parts accordance with Section 416 the IEE Regulations. Appointed person appointed person someone who nominated take charge when someone injured becomes ill, including calling ambulance if required. is used extensively large industrial and commercial installations for sup- porting and SWA cables which are laid the cable tray and secured with cable ties through the tray holes.c