Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 363 z 399

Jak získat tento dokument?






Poznámky redaktora
However, carry out all the tests required the IEE Regulations will require number test instruments and this will represent major capital investment the region £1000.66 Testing continuity protective conductors. The test made with the supply disconnected, measuring from the consumer’s main pro- tective earthing terminal the far end each CPC, shown Fig. 14.6, should earth fault occur. A d.2) The object the test ensure that the CPC correctly connected, is electrically sound and has total resistance which low enough per- mit the overcurrent protective device operate within the disconnection time requirements Regulation 411. The instrument is, therefore, calibrated give reading measured millisec- onds in-service accuracy 10%. Every protective conductor must separately tested from the consumer’s main protective earthing terminal verify that electrically sound and cor- rectly connected, including the protective equipotential bonding conduc- tors and supplementary bonding conductors. Let now consider the individual tests. test using ohmmeter continuity tester suitable where the protec- tive conductors are copper aluminium 35mm2 . Lights Switches Sockets Extraneous metal Tester Long test lead Consumer’s unit FIGURE 14. If you purchase good-quality ‘approved’ test instruments and leads from specialist manufacturers they will meet all the Regulations and Standards and therefore give valid test results.c. . The instrument must, therefore, simulate fault and measure the time taken for the RCD operate.4.Basic Electrical Installation Work 352 RCD TESTER Where circuits are protected RCD must carry out test ensure that the device will operate very quickly under fault conditions and within the time limits set the IEE Regulations.66. 1 Testing the continuity protective conductors (612