Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 354 z 399

Jak získat tento dokument?






Poznámky redaktora
62. Therefore, battery will provide a steady current for 10h. The plates are assembled groups, with insulating separators between them. On new premises the electrical contractor may install sockets and the asso- ciated wiring the point intended line entry, but the connection the incoming line the installed master socket must only made the tele- phone company’s engineer. ● The specific gravity relative density the battery gives the best indication its state charge.150, which will rise 1. ● Battery connections must always tight and should covered with thin coat petroleum jelly. Any number of secondary sockets may connected parallel, but the number tele- phones which may connected any one time restricted. Maintenance lead-acid batteries ● The plates the battery must always covered the dilute sulph- uric acid. 14. Telephone socket outlets The installation telecommunications equipment could, for many years, only undertaken British Telecom engineers, but today electrical contractor may now supply and install telecommunications equipment. On existing installations, additional secondary sockets may installed to provide extended plug-in facility shown Fig.3). discharged cell will have specific gravity 1. ● The room used charge battery must well ventilated because the charged cell gives off hydrogen and oxygen, which are explosive in the correct proportions (IEE Regulation 560. rapid charge discharge encourages the plates to buckle, and may cause permanent damage.6. The sepa- rators are made porous insulating material, such wood ebonite, and the whole assembly immersed dilute sulphuric acid solution in a plastic container. ● maintain battery good condition should regularly trickle charged. The spe- cific gravity cell can tested with hydrometer. Battery rating The capacity cell store charge measure the total quantity of electricity which can cause displaced around circuit after being fully charged. stated ampere hours, abbreviation Ah, and calculated at the 10h rate which the steady load current which would completely discharge the battery 10h. Each exchange line has maximum . Each telephone extension bell marked with ringing equivalence number (REN) the underside.280 when fully charged.Electrical installations and wiring systems 343 A lead-acid battery constructed lead plates which are deeply ribbed to give maximum surface area for given weight plate. the level falls, must topped with distilled water