Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 335 z 399

Jak získat tento dokument?






Poznámky redaktora
1). The iron shell inserted with the spring wire clip end first that the ferrule at the outer surface. The danger may arise because the corrosive explosive nature the atmosphere, because the installation must used damp or low-temperature conditions because there need provide additional mechanical protection for the electrical system Part the IEE Regulations deals with these special installations locations. A hole drilled through the plasterboard and into the cavity. Where electrician not permanently site, MCBs are preferred that overcurrent protection devices can safely reset unskilled person. . All equipment must robust construction order fulfil the on-site electrical requirements while being exposed rough handling, vehicular nudging, the wind, rain and sun. The toggle bolt passed through the fixture and the toggle wings screwed into the bolt.40. The bolt the spring toggle cannot removed after fixing without the loss the toggle wings. The toggle wings are compressed and passed through the hole in the plasterboard and into the cavity where they spring apart and rest on the cavity side the plasterboard. Temporary construction site installations Temporary electrical supplies provided construction sites can save many man hours labour providing the energy required for fixed and portable tools and lighting which speeds the completion project.1 shown Fig.39). The bolt tightened until the fixing becomes firm. 14. However, construction sites are dangerous places and the temporary electrical supply which installed assist the construction process must comply with all of the relevant wiring regulations for permanent installations (Regulation 110. All equipment socket outlets, plugs and couplers must the industrial type 60439 and EN 60309 and specified Regulation 704. Pass compressed toggle wings through plasterboard Tighten bolt until fixture is secure FIGURE 14. SPRING TOGGLE BOLTS A spring toggle bolt provides one method fixing hollow partition walls which are usually faced with plasterboard and plaster skimming.39 Spring toggle bolt fixing.Basic Electrical Installation Work 324 A hole drilled the masonry take the iron shell and ferrule. this section will con- sider some the installations which require special consideration.511. Special installations locations All electrical installations and installed equipment must safe use and free from the dangers electric shock, but some installations locations require special consideration because the inherent dangers the installed conditions. becomes necessary remove and refix the fixture new toggle bolt will have used. 14. Plasterboard and plaster wall ceiling surfaces are not strong enough to support load fixed directly into the plasterboard, but the spring toggle spreads the load over larger area, making the fixing suitable for light loads (see Fig. Definition A spring toggle bolt provides one method fixing hollow partition walls which are usually faced with plasterboard and plaster skimming. The bolt passed through the fixture, located the expanding nut and tightened until the fixing becomes secure