5. daywork be
carried out, the site supervisor must first obtain signature from the cli-
ent’s representative, for example, the architect, authorize the extra work.
Definition
Daywork one way recording vari-
ations contract. This
will depend upon what normal practice for the particular electrical com-
pany.
Reports
On large jobs, the foreman supervisor often required keep report
of the relevant events which happen the site for example, how many
.4
Typical job sheet. This information can then used ‘bill’ the customer for work
carried out.
Job Number
Any special instructions/conditions/materials used
FIGURE 9.
A careful record must then kept the daywork sheets all extra time
and materials used that the client can billed for the extra work. typ-
ical daywork sheet shown Fig.
Daywork one way recording variations contract, that is, work
done which outside the scope the original contract. 9.Using technical information
187
before reassuring the customer that all well; then, off the next job or
back the office.
The time spent each job and the materials used are sometimes recorded
on the job sheet, but alternatively daywork sheet can used.
Daywork sheets
JOB SHEET FLASH-BANG
ELECTRICAL
Customer name
Address job
Work carried out
Contact telephone No