3m for boards 40mm thick ● 2.8 A trestle scaffold. FIGURE 8. The tower built slotting the sections together until the required height reached. The maximum span boards between trestles is: ● 1.5m for boards 50mm thick.6m must tied the building give them stability. Trestles which are higher than 3.Basic Electrical Installation Work 168 Safety First Scaffold ● scaffold mobile towers are always safer than ladders for working above ground.9. scaffold tower shown in Fig. least one-third the trestle must be above the working platform.8 shows trestle scaffold. the platform more than above the ground, toeboards and guardrails must fitted, and separate ladder provided for access. TRESTLE SCAFFOLD Figure 8. Where anyone can fall more than 4.7 Correct procedure for erecting long extension ladder. Start position Footing base of ladder Lift and walk towards wall Continue until upright FIGURE 8. 8.5m from the working platform, trestles may not used. The boards which form the working platform should be equal length and not overhang the trestles more than four times their own thickness. Two pairs trestles spanned scaf- folding boards provide simple working platform. MOBILE SCAFFOLD TOWERS Mobile scaffold towers may constructed basic scaffold components or made from light alloy tube. The platform must be at least two boards 450mm wide.