Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 179 z 399

Jak získat tento dokument?






Poznámky redaktora
FIGURE 8. .7 Correct procedure for erecting long extension ladder. least one-third the trestle must be above the working platform. The tower built slotting the sections together until the required height reached.5m for boards 50mm thick. The boards which form the working platform should be equal length and not overhang the trestles more than four times their own thickness. TRESTLE SCAFFOLD Figure 8. The maximum span boards between trestles is: ● 1. The platform must be at least two boards 450mm wide.5m from the working platform, trestles may not used. Trestles which are higher than 3.6m must tied the building give them stability. the platform more than above the ground, toeboards and guardrails must fitted, and separate ladder provided for access. scaffold tower shown in Fig.9.8 A trestle scaffold.Basic Electrical Installation Work 168 Safety First Scaffold ● scaffold mobile towers are always safer than ladders for working above ground. Where anyone can fall more than 4. Two pairs trestles spanned scaf- folding boards provide simple working platform. MOBILE SCAFFOLD TOWERS Mobile scaffold towers may constructed basic scaffold components or made from light alloy tube.8 shows trestle scaffold. 8.3m for boards 40mm thick ● 2. Start position Footing base of ladder Lift and walk towards wall Continue until upright FIGURE 8