Basic Electrical Installation Work

| Kategorie: Kniha  |

Strana 179 z 399

Jak získat tento dokument?






Poznámky redaktora
The tower built slotting the sections together until the required height reached. 8. The boards which form the working platform should be equal length and not overhang the trestles more than four times their own thickness. . least one-third the trestle must be above the working platform. MOBILE SCAFFOLD TOWERS Mobile scaffold towers may constructed basic scaffold components or made from light alloy tube.3m for boards 40mm thick ● 2. TRESTLE SCAFFOLD Figure 8. the platform more than above the ground, toeboards and guardrails must fitted, and separate ladder provided for access.Basic Electrical Installation Work 168 Safety First Scaffold ● scaffold mobile towers are always safer than ladders for working above ground. FIGURE 8.5m from the working platform, trestles may not used.6m must tied the building give them stability.8 shows trestle scaffold. Two pairs trestles spanned scaf- folding boards provide simple working platform.5m for boards 50mm thick.7 Correct procedure for erecting long extension ladder. The maximum span boards between trestles is: ● 1.9.8 A trestle scaffold. The platform must be at least two boards 450mm wide. Where anyone can fall more than 4. scaffold tower shown in Fig. Trestles which are higher than 3. Start position Footing base of ladder Lift and walk towards wall Continue until upright FIGURE 8