9. The gas, water and central heating pipes the building, not forming a part the electrical installation are called: a. overload d. 8. short circuit. earthing b. earthing conductors b. current which exceeds the rated value otherwise healthy circuit one definition of: a. bonding conductors c. earthing b. 11. bonding conductors c. earth conductors b. The linking together the exposed extraneous conductive parts of an installation for the purpose safety one definition of: a. The conduit and trunking parts the electrical installation are: a. extraneous conductive parts. exposed conductive parts d. overload d. bonding c. overcurrent resulting from fault negligible impedance one definition of: a. The connection the exposed conductive parts installation the main protective earthing terminal the installation one definition of: a. extraneous conductive parts. exposed conductive parts d. 12. earthing b. overload d. short circuit. exposed conductive parts d. 10.137 U W 6 6 2 2 C1 L1 C1 2 C3 4 5 6 To phase supply To phase motor 7. short circuit. protective equipotential bonding c. protective equipotential bonding c. bonding c. . extraneous conductive parts. earthing b